X18


QualicoreHomes
 Share

Recommended Posts

30 minutes ago, Oakriverman said:

That way it would be easier to align your drawings from page to page?

Some easier methods for you that are snappable:

  1. Use points from CAD/Points/Place Points. They are snappable and do not print
  2. Use the Snap Grid and snap your drawings to the same points
  3. Send your view once, then use the copy with paste hold position to a new sheet to maintain position, then use the relink tool to relink to the view you want. This will maintain position exactly

Hope that helps see video:

Link to comment
Share on other sites

1 hour ago, Oakriverman said:

I have a question, has anyone ever asked for reference displays on Layout?  That way it would be easier to align your drawings from page to page?

I use a different method.  My drawing sheets are the same size (point markers lower left and upper right) as the layout pages.  When sent to Layout they fill the page 100% automatially.

 

Another option is to place a polyline on the drawing sheet matching the sheet boundary.  

Edited by Joe_Carrick
  • Like 1
Link to comment
Share on other sites

I just note where my crosshairs land on the left and right by looking at what icon they are touching, and then align the main floor height to that for each one and call it close enough. The issue for me is elevations. Joe, what do you do to align those?

 

I like Rene's point marker way.

 

for this

 

7 hours ago, Renerabbitt said:

Send your view once, then use the copy with paste hold position to a new sheet to maintain position, then use the relink tool to relink to the view you want. This will maintain position exactly

CA changes my floor to 0 when relinking to another SPV, or maybe it is to another plan. dont remember. I just remember it is a tad annoying

Link to comment
Share on other sites

RENE #3 is my preferred method.

 

I send a Footings Saved Plan View (SPV) to Layout - position it where I want it - then copy - next sheet Paste Hold Position - next sheet Paste Hold Position - next sheet Paste Hold Position - next sheet Paste Hold Position.

 

On Foundation Sheet, reLink Layout View Port to Foundation SPV

On First Floor Framing Sheet, reLink reLink Layout View Port to First Floor Framing SPV

 

Repeat

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share