I will be hosting a:

 

Walls/Railing Workshop Tuesday,  April 24rth at 3:00 PM PST

 

This will be an online meeting.  If you are interested,  please email me.  Do not call me,  do not answer in this thread,  do not text me and do not send smoke signals.  

I think Glenn Woodward might be able to make it and he is The King of railings.  This should be a good workshop.

Please email me at

 

dscotthallATmacDOTcom

  • Upvote 1

Share this post


Link to post
Share on other sites

Some one just asked me if it will be PST or PDT.  It will be 3:00 California time when my Iphone says 3:00.  

 

I get it..... sometimes we cannot be clear enough.  

 

I guess it would be PDT .....  

Share this post


Link to post
Share on other sites

3:00 pm PDT means 6:00 pm east coast EDT

3:00 pm PST means 7:00 pm east coast EDT

 

But we know you really meant PDT ;)

Share this post


Link to post
Share on other sites

I won't be able to make it Scott , so please Record it if at all possible thanks.

 

Mick.

Share this post


Link to post
Share on other sites

This should be a good workshop.  We have 11 folks so far.  We will start promptly at 3:00 my time.  If you have anything to share,  that would be super.

Share this post


Link to post
Share on other sites

I really want to join you guys. Let's see . . . 5 pm CDT . . . mother-in-law's birthday dinner . . . but I really want to join the CA workshop . . . mother-in-law's birthday dinner . . . Please record it for us married folks. :)

 

Charles

Share this post


Link to post
Share on other sites

If I remember,  I will record.  ChopSaw is usually kind enough to record but I think he said something about using up all his download time....  I will try....

 

yeah,  you better go to the in-law's bday.

Share this post


Link to post
Share on other sites

If I remember correctly we will receive an invite to GoToMeeting via e-mail from you Scott? Hope I'm not the only one who doesn't remember the process exactly and Thanks in advance...

Share this post


Link to post
Share on other sites

I send emails out 15 minutes before meeting  (2:45 my time today)

Share this post


Link to post
Share on other sites

I just sent out the invites,  if you did not get one,  email me at 

 

 

dscotthallATmacDOTcom

 

 

 

Share this post


Link to post
Share on other sites

Thanks to all that attended and a big thanks to Glenn for presenting and to Steve for the wall  solution I was after.

 

Here is the vid. 2 hours long,  probably tough to watch,  better to just listen for any highlights,  always better to be there.

 

 

 

 

  • Upvote 4

Share this post


Link to post
Share on other sites

Got a lot out of this meeting, good job everyone. we can all see that terrain railings need some work still.

Share this post


Link to post
Share on other sites

Thanks for recording it Scott , I definitely have a look ...

 

M.

 

 

Share this post


Link to post
Share on other sites

An alternate for the block wall I came up with toward the end but my mike wasn't working or something. This is a bit easier to control and change.

From left to right sequence -

  1. fence-panels, no post, 0 newel width, steps to terrain-
  2. change wall type to CMU -include bottom rail, select some square molding and set height to desired bottom wall height
  3. change texture to block
  4. rotate texture
  5. 5 adjust newel spacing

5ae0a886164d2_Lefttoright.thumb.png.bc0c76bd0821402b26936f560755e155.png

Block doesn't like follow terrain using this though

5ae0a898ee593_Blocksdontliketofollow.thumb.png.c3715a80c0b45530d7a9029808e40b36.png

Share this post


Link to post
Share on other sites

I found it very interesting that we could not change the FOOTING MATERIAL.  

 

I suppose somewhere in the defaults it can be changed, but that would CHANGE ALL FOOTINGS.

 

So  if you wanted 2 DIFFERENT FOOTING MATERIALS for two different walls,  it is not possible.

 

 

Share this post


Link to post
Share on other sites

Scott what would be the purpose that you want to change the footing material since all footings are concrete, except back here if they use superior walls then it is on pee gravel compacted with drain tile around that is the only way you can put them on

Share this post


Link to post
Share on other sites

Thanks for hosting the meeting Scott.  I had to leave after the first hour so glad you recorded it.

Share this post


Link to post
Share on other sites
23 minutes ago, chief58 said:

Scott what would be the purpose that you want to change the footing material since all footings are concrete, except back here if they use superior walls then it is on pee gravel compacted with drain tile around that is the only way you can put them on

 

You cited a reason why you would want two materials,.

 

The reason I wanted to do it yesterday is we were trying to do a work around.....  it was Richard Morrison's idea ....  using the footing as CMU and having it go into the terrain..

Share this post


Link to post
Share on other sites

yea in elevation view it would be good when I do my section details I have a detail with gravel in it for superior walls, not sure if you have those type of walls out west since you don't need frost walls :)

Share this post


Link to post
Share on other sites

I was having a bit of a play with these types of walls.

You can come up with some interesting combinations.

New Image_89.jpg

New Image_87.jpg

New Image_88.jpg

  • Upvote 1

Share this post


Link to post
Share on other sites
15 hours ago, glennw said:

I was having a bit of a play with these types of walls.

You can come up with some interesting combinations.

New Image_89.jpg

New Image_87.jpg

New Image_88.jpg

Who would have thought this is possible , nice Glen. I guess I also need to play around with them.

Share this post


Link to post
Share on other sites

Nice job Glenn....  are they walls or fences?

 

I am assuming wall since you have a footing.

I am assuming they do not follow terrain (or not a stepped fence)  (since it it a wall and not a fence)

I am assuming they were all edited in elevation

 

BTW,  I am really getting into the auto story pole.  I wish we could adjust the height of walls  (particularly retaining and site walls ) in plan view in lieu of editing in elevation.

 

In this project,  I needed to adjust the top and bottom of wall to a specific height relative to sea level. 

 

I5ae20969c4439_ScreenShot2018-04-26at10_14_16AM.thumb.png.1cda1b73c0d43c15cea4931fbb7f0419.png   5ae209caebffe_ScreenShot2018-04-26at10_17_49AM.thumb.png.f2aebcd26896e586ca8994b76904f495.png

 

AND AND AND ,  I wish we could adjust the height of the walls 2 ways

1-   relative to the first floor  (0.0)

2- relative to M.S.L.

 

 

 

  • Upvote 1

Share this post


Link to post
Share on other sites

Scott,

Yes, they are walls and your assumptions are correct.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27450
    Total Members
    6254
    Most Online
    Elliot
    Newest Member
    Elliot
    Joined