scottharris

Chief Architect Moderators
  • Posts

    438
  • Joined

  • Last visited

Everything posted by scottharris

  1. There's a newer version of this video (at the same link) you might see if it helps.
  2. Here's an image of what I think you are asking for. Schedules can include multiple categories, e.g., cabinets and fixtures in a single schedule
  3. You can rotate a single label. Maybe you are looking for a tool to rotate all labels at once?
  4. Renaming the framing to "...SPF" will not impact the framing spacing - provided you have 'default' checked in the wall definition.
  5. I noticed your 'rooms' layer was not on in 3D. Try turning that on and painting the wall in 'component mode'. See attached.
  6. I set my framing to use the 'default' in the wall definition - per my attached image in the post above. Then, in the build framing dialog, you can enter 16", 24" or __". I think that's the way the new X13 template plan is setup as well.
  7. You might check in the wall definition to use the ‘default’ wall framing. It also looks like your framing material is using "…stud 24 OC”. In X13 we changed the framing to be independent of the wall material e.g., ‘fir framing’ vs. ‘16” fir framing’. See attached image if it helps.
  8. Steve, you can see the differences from Mac and PC on the system requirements page. The M1 Mac v. Intel Mac - the M1 is an integrated chip which are typically less powerful.
  9. The desktop client viewer can be downloaded for both X12 and X13
  10. The Mac M1 computers now run with Chief Architect X13.
  11. The Mac M1 computers now run with Chief Architect X13.
  12. Apple’s strategy is to develop its processors in-house. They no longer use NVIDA and will move away from AMD. Not sure how long before its GPU will be on par with NVIDA or AMD. BTW, Lenovo has a laptop with an NVIDA 2070 RTX or Desktop at Newegg with a 3070 for right around $2k.
  13. Gene, you might also open your flat ceiling and uncheck "use room ceiling finish" - it seems to remove the cross hatch.
  14. Larry, the detail is done in Chief. The callouts/arrows were added in the section view using the callout tool. You can see this in the video at around the 18:30 mark. Glad you commented!
  15. Attached is a wall that is a moment frame from the Lake Point sample plan. It uses I-beams and has been engineered. It’s on pg. 12 of the layout if you want a closer look. There’s also a detailed video in the playlist for the framing.
  16. Michael, on Thursday June 3 @ noon Pacific we are going to schedule a live webinar to introduce the new X13 features and provide a detailed list. Michael, on Thursday June 3 @ noon Pacific we are going to schedule a live webinar to introduce the new X13 features and provide a detailed list.
  17. Larry, our target X13 release is scheduled for the end of June
  18. Be sure you have Mac OS Mojave or Catalina. Refer to the Mac OS system requirements here: https://www.chiefarchitect.com/products/sysreq.html You can give our Tech Support a call M-F 7am-5pm for further help
  19. These half walls should have a cap on them without needing to make additional changes. You might open your plan in X12 and see if the problem is resolved in the newer version; although it should also be fine in X11. Consider posting your plan.
  20. scottharris

    Bachelor View Project

    The Bachelor View Project was developed as a sample plan for Chief Architect version X12. Why the name 'Bachelor View' ? It has a view of Mt. Bachelor in the Cascade mountains.