i have added a few different columns to the hvac sched and renamed them, how do i get this info into each column?

hvac sched.JPG

Share this post


Link to post
Share on other sites

Basically, you have to open the Note Specification dialog and enter the information on the Object Information panel (OIP) for the columns you renamed.

Share this post


Link to post
Share on other sites
On 9/26/2019 at 10:19 AM, Dermot said:

Basically, you have to open the Note Specification dialog and enter the information on the Object Information panel for the columns you renamed.

Dermit only thing is those fields never appear to load text into.. I must be missing some thing..

 

Share this post


Link to post
Share on other sites
26 minutes ago, dskogg said:

Dermit only thing is those fields never appear to load text into.. I must be missing some thing..

 

You just need to examine which fields you're entering text into, and ensure those fields are included in your schedule.

Share this post


Link to post
Share on other sites

When I open object those fields are not there to load info into? 
i must be missing something.

Share this post


Link to post
Share on other sites
4 minutes ago, dskogg said:

When I open object those fields are not there to load info into? 
i must be missing something.

 

Remember you are using a note schedule, so you need to use the OIP fields for the note.  If you want to do it the other way you would need a Fixture schedule.

Share this post


Link to post
Share on other sites
36 minutes ago, Chopsaw said:

 

Remember you are using a note schedule, so you need to use the OIP fields for the note.  If you want to do it the other way you would need a Fixture schedule.

Dumb question oip?

Share this post


Link to post
Share on other sites
51 minutes ago, dskogg said:

Dumb question oip?

No such thing. Object Information Panel

You should post a screenshot of one of your notes with the dbx open. Or the plan. You'll get timely and accurate help!

Share this post


Link to post
Share on other sites

here is a couple of pics , there is no extra fields to input text,

note object info panel.JPG

note object.JPG

Share this post


Link to post
Share on other sites

Oh, that is a U18 error. The problem is the user 18" from the screen is not posting the plan. Ehh. :)

 

Share this post


Link to post
Share on other sites
16 minutes ago, dskogg said:

here is a couple of pics , there is no extra fields to input text,

note object info panel.JPG

note object.JPG

 

I see a blank Manufacture field but that is not the schedule you originally posted.  Looks like you also created custom fields in your original posting.

Share this post


Link to post
Share on other sites

"i have added a few different columns to the hvac sched and renamed them, how do i get this info into each column?"

 

So this all depends on what columns you added and renamed.  For example, if you added the "manufacturer" column, then it is very easy to add your own custom info to the manufacturer data on the Object Information panel.  But if you added a column that does not appear on the Object Information panel, then you may or may not be able to add any custom info.  You can also add your own custom fields and columns.  

 

It would be much easier for someone to figure out what you did if you post a plan demonstrating what you did.

Share this post


Link to post
Share on other sites

here is an example, i changed the field names in the note schedule specifications, looking to load text into them but they dont show up even though i have added them to schedule...i must be missing something?

note sched example.zip

Share this post


Link to post
Share on other sites

David you need to create the fields in the note DBX and then apply them in the schedule DBX.

 

Take a look at the revised plan file and I hope it makes some sense or you may have to hook up with someone live.

 

Mechanical Note Schedule.jpg

note sched example Chopped.plan

  • Upvote 1

Share this post


Link to post
Share on other sites
5 hours ago, Chopsaw said:

David you need to create the fields in the note DBX and then apply them in the schedule DBX.

 

Take a look at the revised plan file and I hope it makes some sense or you may have to hook up with someone live.

 

Mechanical Note Schedule.jpg

note sched example Chopped.plan

I will try this.. how would I create fields?

Share this post


Link to post
Share on other sites

I did not fix the Airflow Column in the test plan as it must have been something that was already giving a value of "1".

 

Try adding that to the Note Specification OIP and then re apply it in the Schedule DBX.  Enter your values in the Note DBX.

 

New Fields.JPG

Share this post


Link to post
Share on other sites
15 hours ago, Chopsaw said:

it must have been something that was already giving a value of "1"

 

It's the Renamed Qty. Column Chop so it's likely using the %automatic_count% macro so not very useful here as we don't have access to it AFAIK. 

 

David..... it's better to not use QTY and use a renamed Code or Comment Column ( old method )  to Airflow ( see pic)  or create your Own Custom Fields for Airflow2 (in this case) or CFM if that is what the Column is for , then in the Schedule add the New CFM or Airflow2 Columns ( see pics) , from the available list, to the Columns to include.

 

image.thumb.png.30ac6df44da6183b635f5dc568fafe79.pngimage.thumb.png.accb00a4b23d57a958a9fea8c3c93318.png    

  • Upvote 1

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    28631
    Total Members
    9156
    Most Online
    sawallace64
    Newest Member
    sawallace64
    Joined