Everything posted by DRAWZILLA
-
Well, I normally don't have problems with floor heights and foundations, but I do agree, it should be easier for most people. Maybe more videos for different conditions would help. I usually start out using the automatic foundation, mostly to save time. Then I always have to turn off automatic foundations and manually repair areas that don't work as advertised. of course with lot of different levels, a lot of manual repair is usually needed. I don't think Chief really can do all conditions automatically, its kind of a new feature, maybe from X2 or 3 and wasn't thought out as it should be. But it works for me and was a lot worse back then, believe be when I started using Chief they didn't have anything for slab floors, except for just the slab tool. Small things like which level you want the wall on can give you fits, the secret is call the room a porch if you want the wall on the high side of the foundation. of course it's not a porch just add whatever name you want and adjust the floor finish and things like that. After that does the drywall come down ,on the foundation, to the lower level--no, so you have to also repair that. Sometimes I can just adjust the brick ledge to fix that, and sometimes it doesn't work and have to add a p-solid or create a new foundation wall with the drywall added. I could go on and on about things like that but all in all I like Chief and things like this could be in all the 3d software's. and it would be nice if it was documented somewhere. Oh yeah , there seems to be a virtual slab in Chief, when no slab is present. figure that one out. I still find little thing I didn't know of before and probably will forever.
-
Close enough for me, never had any problems with cities. but this is, of course, until they fix it. A few square feet here and there doesn't bother me.
-
Try to put a wall break in that attic wall where in intersects with the other wall where the wood shows. You can reverse the two walls so they don't re-connect again.
-
Without seeing your exact condition, you can do that using the stair tool adjusting the materials and some settings. Lots of other ways too.
-
I understand what you are talking about, most of Chiefs videos and print materials are for basic conditions, but I think that b/c Chief is so versatile , there is no way to show every condition that is possible. I don't think Autocad ,Archicad or Revit does that either.
-
Yes, but some people are saying they can't get my deal. I guess I have been with them for many-many years, so I get a special price per map. I can't find there phone # right now but it should be on their web site. I had to call but you may be able to do it online , not sure. My transfer to them was automatic.
-
To lower that stem wall, just lower the (SWT) stem wall top for that room to what you need. turn off auto foundation if you need to. Have not looked at your plan.
-
All you can do with AutoCAD (DWG) files is import and trace over or you can try to use the Cad to walls tool. For me ( because everything is already set up using template plans and layouts) I would just trace over the Autocad plan. There is no automatic import 3d with those files.
-
OR, just balloon frame that wall to fill it in, unless you need to show a truss there.
-
Perry's Declarative Title-24 Statement Regarding Replacing Glazing
DRAWZILLA replied to dshall's topic in General Q & A
This is an old thread, now you do need to fill out all the California title 24 stuff, but not when this thread started. Otis, my sister in law Rae, was Mayor of Ojai a few years ago. -
Nice, next question, does it frame well? Just curious how the model as a whole works for you. Can you cut sections easily that look correct. Nice job.
-
How do you manage your tasks and projects?
DRAWZILLA replied to RichardBradley92's topic in General Q & A
For me , it's the squeaky wheel method, When they call and say ,"where's my plan", I then work on it. When they don't call, I work on it anyway, if it's that plans time to do.. If your busy, don't lie to the customer, if your 5 weeks out just to start it ,TELL THEM. I find people like hiring someone who is busy, rather than someone who isn't. By all means collect you fee, and hammer the money.- 7 replies
-
- Task
- Task Management
-
(and 5 more)
Tagged with:
-
Microsoft said it would open faster and apparently it does, who would have thought. I plan on doing me this weekend.
-
I do mine out of a molding p-line or just use p- solids
-
TIps On Elevation Layouts & Measurements.
DRAWZILLA replied to fredgar52's topic in Tips & Techniques
Just post your questions here and we all will help. I'm sure being in Florida, you might have special conditions but we will still try. If you get the correct answer from anyone, just make sure to give me the point.- 4 replies
-
- Beginners
- Elevation Layouts
-
(and 3 more)
Tagged with:
-
Thank you buddy, I'd rather have cash.
-
nice
-
I have already installed the NVidia driver that just came out, will install win 10 this weekend.
-
Thanks Gawd, no rush for me. I'll do it over the weekend when I get some free time
-
looks to me like a wall with a roof material on it.
-
I haven't got my notice yet
-
They can't possibly offer all of them at the same time, They will space them out. That's why we have reservations.
-
It looks like you modeled your deck floor joists 24" thick when you should have used two separate framing systems, one for the floor and one for the ceiling,
-
Really, then why the comment. And how can anyone help with that statement, it was funny to me ,when I read it. Exactly how could anyone have helped that. Please enlighten me.
-
To change the ceiling height keeping the floor above , you have to use the floor definition from above and add a dropped ceiling with framing in the floor DBX ( using your math skills) and build the correct config you need. really simple. For the lowered walls you can use railing walls for that. I also use this method when I have a second floor addition and want to keep the 1st floor ceiling joists and overbuild the 2nd floor, I just wish there was a way to control the existing ceiling joists direction, they have to go the same direction as the floor joists now. I have to repair the sections when that happens.