Remodelling


rickyscott
 Share

Recommended Posts

I am a fairly new user to chief and i am trying to figure out how to show the different phases of my project. By this i mean like Existing Plan, Demolition Plan and new wall plan.I am thinking CAD lines and using layer set but this is a little challenging for me so i am wondering if there is an easier way to accomplish this. 

Link to comment
Share on other sites

First thing - do the as is plan and save.  Then from the as is plan do a save as and give it a name

and then start your design. When I was in the business I would do accurate drawings, dimensions for the area I was going to work on

but would eyeball the other areas so they looked correct. Many times only adjacent rooms etc. Usually always put a roof on it to stop 

"light bleed" at top of walls etc.  Light bleed shows up in ray trace views.

I often sent views from the as is plan just to show the transition.  You can however get more complicated with layers and demo walls to

overlay the new or existing design to show demo walls etc. There are threads on this you may want to search for.

Link to comment
Share on other sites

There are several methods, but I think the vast majority of us do it with 3 plan files as both you and Dennis have alluded to.  The basics:

 

  1. Draw As-Built plan.  Name it "As-Built".  Save.
  2. Use "As-Built" plan but Save As "Demolition". 
  3. Create a CAD Detail From View of your floor plan(s), modify and delete items as necessary, put all the line work onto a unique layer, paste hold position and move to back group.  This will allow you to both see and display the as-built items if desired.
  4. Modify plan as necessary to create demolition plan.  Save.
  5. Use "Demolition" plan but Save As "Proposed".  Modify plan as necessary to create Proposed plan.  Save.
Link to comment
Share on other sites

Learn to use Anno-sets, and layer sets , you don't need to use any cad except for the cad background, to do all of it. Create different walls for existing and new. Create a cad background of the existing as built plan, and put it in the background of you new remodeled plan.Too much to list all here, watch some of Chiefs remodeling videos. I have my own way of doing it, but it's similar. doing all of this, when you remove a wall the cad background wall will show up automatically and that's much cleaner than having invisible walls. It quite a process, not everything is listed here but as you go you will learn.

 

 

Link to comment
Share on other sites

I'm contrarian :)

 

I create the remodel plan first as that is what the clients want to see

 

when that is "stable"

 

I do "save as" for the as-built plan and take out remodel stuff

and tinker as necessary to get to as-built sometimes doing non-remodel areas as "rough"

and not showing unnecessary details

 

various methods for showing demo walls etc

 

Lew

 

Link to comment
Share on other sites

If you are new to CA I highly recommend the New Tutorial Guide and getting to know the CA Knowledge base (KB) which has many,many tutorials too eg. one on what Michael mentioned with the CAD Detail...

 

https://www.chiefarchitect.com/support/article/KB-02208/showing-the-as-built-in-a-remodel-plan.html

 

https://www.chiefarchitect.com/support/database.html

 

Tutorial Guide and Ref. Manual

 

https://www.chiefarchitect.com/support/documentation.html

 

***It is recommended to Fill in your Forum Signature too...see mine for how to do yours...

Link to comment
Share on other sites

  • 6 years later...

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share