Evolution Posted October 8, 2015 Share Posted October 8, 2015 Site work started back in the summer, on my Lake House Project. Just wanted to share some photos. The client said he would send updates as the construction progresses, I'm happy to see something I designed coming to fruition. Looking N toward existing lake house.pdf Looking NE toward the existing lake house.pdf Looking NW toward existing lake house.pdf Looking SE toward lake.pdf Link to comment Share on other sites More sharing options...
DRAWZILLA Posted October 8, 2015 Share Posted October 8, 2015 Nice, hope they got massive amounts of fire insurance. Link to comment Share on other sites More sharing options...
glennw Posted October 10, 2015 Share Posted October 10, 2015 Bob, I'm glad to see that project underway. You certainly put a lot of effort into the design and documentation. Link to comment Share on other sites More sharing options...
DavidJPotter Posted October 11, 2015 Share Posted October 11, 2015 Looks Great! DJP Link to comment Share on other sites More sharing options...
HumbleChief Posted October 11, 2015 Share Posted October 11, 2015 Nice Bob, Keep us posted on progess please. Link to comment Share on other sites More sharing options...
Evolution Posted October 12, 2015 Author Share Posted October 12, 2015 Glenn Woodward, you did a lot to help me advance my skills with CA and believe me it was a LIFE SAVER with the pressure I was under to get it done!. I'm told I've got another large one coming up (word of mouth from the Lake House client) His friend wants to build in the same area. I hope to be able to use (what I can remember) the skills you shared especially building the roof with the roof base line and practicing on the site plan. I hope the new client provides a better topo (maybe a gps version that I can import elevations from). I'll probably need a refresher from you on using the roof tools. Link to comment Share on other sites More sharing options...
glennw Posted October 12, 2015 Share Posted October 12, 2015 No worries Bob, let me know when you get the new project underway and I'll give you a hand if I can. The next one should be easy! Link to comment Share on other sites More sharing options...
Evolution Posted October 16, 2015 Author Share Posted October 16, 2015 Well, the client is extremely upset (understatement). A heavy rainstorm (7" in two days) moved in and dumped tons of water on the site. He wasn't aware that when the original builder of the 2004 Lake House built, that he had not put any rebar in the footings, so with the pad cut out for the basement of the new lake house, and the retaining wall/foundation wasn't in yet, the existing house foundation was undercut, and the south end came down!My source says he got it shored up, and safed off, then backfilled and underpinned, the NE retaining wall-basement wall is in now and the builder will have less demo to do of the existing house in order to tie it into the new lake house. Pictures attached. According to my source, all this has transpired since May, they should be getting ready to start the framing, soon. Hopefully be able to post some more updates as soon as he sends them to me. (E) lake house storm damage.pdf (E) lake house Storm Damage 5.pdf (E) lake house Storm Damage 2.pdf (E) lake house Storm Damage 3.pdf Basement looking southeast before retaining wall.pdf Link to comment Share on other sites More sharing options...
Rich_Winsor Posted October 16, 2015 Share Posted October 16, 2015 Wow! I hate when that happens. Crazy how the sofa and end tables are completely untouched. Link to comment Share on other sites More sharing options...
Evolution Posted December 14, 2015 Author Share Posted December 14, 2015 Lake House Framed & Under roof Dec 2015.pdf Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now