Designer100

Pier and Beam issue using CMU BLOCKS

Recommended Posts

I have home I had finished with regular foundation. Now have to raise 54" off grade with concrete blocks around exterior with screen in between. Pier and beam foundation with floor joists at living area and rear decks and front porch. both garages to be at 50" off grade and slab foundation. Any help out there to suggest how I do this. I have chief architect x7. File attached. the cmu blocks needs to go to grade at 0.  I have searched videos and cannot find anything like this. rear outdoor room and veranda is not putting floor joists and decking in automatic.

 

Thanks if someone can help. 

 

newell.cheatheam@gmail.com 

Share this post


Link to post
Share on other sites

make sure to hit the Attach button in the More Reply Options Area to attach the file after you have selected it.

 

  And make sure Plan is not open in CA or it wont attach either.

 

M.

Share this post


Link to post
Share on other sites

I see you're close to me. Give me a call if you like and I'll explain how we do this.

  • Upvote 1

Share this post


Link to post
Share on other sites

I didn't have a chance to do a meeting with him last weekend. I threw my back out and couldn't sit. I'll contact him today.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27478
    Total Members
    6254
    Most Online
    Oilersfan20
    Newest Member
    Oilersfan20
    Joined