  1. Thanks Joe, Have a great week,Ken
  2. Canuck, I completely stay away from norton. I use malwarebytes and have no problems. Have a great weekend,Ken
  3. you need a program with a pdf printer, Chief has one or you can download one free of the internet. Set it up as if it were an actual printer and print to this printer and save to your desktop and then e-mail to your friend. Hope this is clear and helps. Have a great week,Ken
  4. Canuck, Just delete one of each file. Won't have any effect on the other one. I have had this happen Just takes a while to go through and delete the extra one. Have a great week,Ken
  5. Not seeing your attachments Ken
  6. Charlie , Good job. Could you make it into a symbol and post it? Have a great week,Ken
  7. Kevin, Glad I read this thread. Good tip this has been bugging me for a while. Have a great week,Ken
  8. Problem solved. Had to do the molding polyline thing. Just had to try to get the auto roof returns to work. It is my contention that when the program toughs a specific feature it should work as advertised. Kelly thanks for your reply. Have a great week,Ken
  9. I am ready to pull my hair out over these returns. Some will generate and some here and there. Have searched the training videos and seems there is not one on this subject. Does anyone know of one or have a guess as to why these will not generate.
  10. A joist can bear on a beam but a beam can't bear on a joist thus the name for the two different members.
  11. What version are you currently using?
  12. Mike; Bosch DLR165,it does all I need.Have had it for couple years, can't remember price. Have a great week,Ken
  13. About the zero level entry, I think code requires 8" distance from earth fill to framing so this will have to be addressed in some way. Have a great week, Ken
  14. Joe, Good job and thanks. Hope this gives your rep. a boost. Have a great week,Ken
  15. Correct, floor /ceiling truss, I stand corrected. Was taking a break from a project and looking through the forum and saw the question and since there were only comments with no real directions, I thought I would start the man down the path to a point that he could pic up and continue on. As pointed out by drawzilla,you will have to determine the depth of the joist as required and also set the framing distance and then draw in the first truss and select multiple copy and drag across the plan as needed to complete the floor system. Have a great day,Ken
  16. I don't see a walkout,Looks like exposed foundation to me. Can't see around the corner though. Have a Happy Day,Ken
  17. Electromen, Make the exposed walls ,pony walls and put your brick on the upper wall, then adjust the upper wall down to show brick as needed. Specify main wall type for lower wall and make upper wall 4" less to allow for the 4" for brick. Have a great week,Ken
  18. Click Build,Click framing from dropdown list,Click Floor /roof truss,Click floor truss and specify in dbx as you like. Have a great week,Ken
  19. I understand chief encourages the use of activate and deactivate licenses on line but your situation is exactly the reason I always buy the dongle even though CA has a long list of reasons not to. Just have to make sure you pack the dongle or dongles when you go to another location. Have a great week ,Ken
  20. Thanks Joe,Will have to try that. Working on a plan already started in x-5. Have only been playing in x-6 to get familiar with new stuff. Have a great week,Ken