GeneDavis Posted April 19 Share Posted April 19 I feel like I'm on a merry go round and cannot get off. I have two floors and a foundation done as a slab with stemwalls. Schedule numbers get generated in single digit format, but then I try notes on another floor and start getting X.Y format. Do I have to first do floor-specific plan views to get this to work? Link to comment Share on other sites More sharing options...
robdyck Posted April 19 Share Posted April 19 All you should need is a separate schedule for each floor with the included items limited per floor. Link to comment Share on other sites More sharing options...
GeneDavis Posted April 19 Author Share Posted April 19 Not working. I populated the 2nd floor plan with notes that rang up 1 through 7, went to the second floor plan, placed a note, and it numbered it 8 and put it in the schedule of second floor notes. Link to comment Share on other sites More sharing options...
HumbleChief Posted April 19 Share Posted April 19 16 minutes ago, GeneDavis said: Not working. I populated the 2nd floor plan with notes that rang up 1 through 7, went to the second floor plan, placed a note, and it numbered it 8 and put it in the schedule of second floor notes. Ran into this myself and I think you need to place another schedule on the second floor? Link to comment Share on other sites More sharing options...
GeneDavis Posted April 19 Author Share Posted April 19 No, there's no way the note schedule begins afresh when I go to another floor. Are all us users happy with this notes function? Is there some easy way to do one schedule per plan view floor? Link to comment Share on other sites More sharing options...
SHCanada2 Posted April 19 Share Posted April 19 change the category, one categiry type for each floor? floor 0: floor 1 1 Link to comment Share on other sites More sharing options...
robdyck Posted April 19 Share Posted April 19 1 hour ago, GeneDavis said: Is there some easy way to do one schedule per plan view floor? That is the easy way. I do this all the time. One schedule per floor...only notes included from that floor. I'm doing it right now actually. PM me with your plan file if you don't want to post it here and I'll show you what you can do specific to your project. And then I'll return your file. Link to comment Share on other sites More sharing options...
robdyck Posted April 19 Share Posted April 19 In the meantime 2 things to try first: Renumber Schedule select schedule, Ctrl-x, Ctrl-alt-v Link to comment Share on other sites More sharing options...
glennw Posted April 19 Share Posted April 19 Include Objects from floor does it for me. This is with a seperate schedule on each floor. Or do you want only 1 schedule to include both floors? 1 Link to comment Share on other sites More sharing options...
GeneDavis Posted April 20 Author Share Posted April 20 I think I have it now. The solution is to make sure the schedule dialog box is opened and to make sure the "Include options" is all set correctly so as to NOT include all floors and ONLY include the current floor, which Chief has set to the floor on which the schedule was generated to appear. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now