Kenoeightspot

Members
  • Posts

    428
  • Joined

  • Last visited

Everything posted by Kenoeightspot

  1. http://www.keuka-studios.com/keuka-installation.aspx
  2. Add additional mouldings 1,2,3 etc. with different profiles and hts.
  3. As Glenn said cut the wall on the right then add a polyline soild as a cap on the short wall.
  4. Try copying that door to another blank plan or even to another floor level and see if the glass changes. Or Post the plan
  5. Dan Baumann at "Chief experts.com" X6 classes starts April 17th.
  6. Connect the switch to the outlet first then move the connection wire to the opener box.
  7. There is one in the lib. but it looks like the other standard switches
  8. Larry, I would like the same thing. Have the option for line wts. on or off separately in plan and layout.
  9. correct the wall connection or uncheck "circle unconnected wall ends"
  10. Something like the attached?. Make an "Open Below" room.
  11. Click on the "Spray can Icon" then check the "Use default" box, then click on the top and bottom walls and see if this changes your walls back to the default wall types.
  12. Use a Moulding polyline and change the Sill profile as needed.
  13. Is your Temp. Dim. Icon turned on
  14. https://chieftalk.chiefarchitect.com/index.php?/topic/372-barrel-ceiling/