What is a Good Way to Build This Soffit?


DRyeHD
 Share

Go to solution Solved by CharlesVolz,

Recommended Posts

The example in the photo looks like it uses some sort of parallel chord truss system over the patio area, just however deep you need it to be, order the truss' that size and finish appropriately. Shouldn't need to be insulated at all either, do make sure its vented though if your using a T&G finish.

As long as you have sufficient separation and sheathing @ the wall to isolate the area, make sure you detail that in there to avoid temperature difference issues etc down the road. 

 

In the program. @CharlesVolz had it bang on. Create some ceiling planes over that patio and set the height, framing should fill in with Truss / defaults / etc. 

17 minutes ago, CharlesVolz said:

use ceiling planes.

 

  • Upvote 1
Link to comment
Share on other sites

I think it's done with roof structure.  Looks like a framing depth of 20 inches or so, with a parallel chord truss.  The roof is overhanging that windowed gable wall.  The gabled roof edge has a shadow board fascia, and the finished fascia is matching siding.  You'll do that with p'line solids.

 

AFAIK, we've no way to make a fascia board have a texture to match that of a siding.

Link to comment
Share on other sites

1 hour ago, CharlesVolz said:

Howdy Damon,

 

If you trying to show that exterior wall strip below the roof, use ceiling planes.

 

If you selected roof trusses, they will build between the ceiling plane and the roof plane. The elevation of the ceiling planes and roof planes determines the roof structure's depth.

Link to comment
Share on other sites

13 minutes ago, TCB_BdnMY said:

"thick wall" just be really odd framing?

yup, hence the quick and dirty, haha..talking to a GC that hasnt produced an accurate framing plan in decades..it takes too long. my details handle that, my framers handle that too, deferred truss submittals..engineers approach
image.thumb.png.80777bdc7268af0098a1d22f94c1129c.pngimage.thumb.png.6a7461c0ba00b658083a6c056ad433a0.png
one could also build a room instead, vaulted ceiling, doorway, just takes a smidge longer but will actually build the framing more accurately

 

Edited by Renerabbitt
  • Upvote 1
Link to comment
Share on other sites

31 minutes ago, Renerabbitt said:

talking to a GC that hasnt produced an accurate framing plan in decades..it takes too long. my details handle that, my framers handle that too, deferred truss submittals..engineers approach

 

Exactly. I never met a framer that did it my way. Always their way. But always good.

Link to comment
Share on other sites

14 hours ago, Renerabbitt said:

yup, hence the quick and dirty, haha..talking to a GC that hasnt produced an accurate framing plan in decades..it takes too long. my details handle that, my framers handle that too, deferred truss submittals..engineers approach

 

13 hours ago, CharlesVolz said:

 

Exactly. I never met a framer that did it my way. Always their way. But always good.

 

Goodness I wish. For something like that where I'm at, the city would want a full tall wall framing plan and section of the front area along with the submitted truss plans etc. 
I mean, its not the worst thing, but oh well. 

Still cool to see the "quick n' dirty" solution, sometimes thats all you need.

 

Link to comment
Share on other sites

16 hours ago, TCB_BdnMY said:

full tall wall framing plan and section of the front area along

I just handle this with details. I have a detail system that is largely automated. then callouts and big bubbles on a minimal cross section. my details stack up to look like cross sections
A lot less work then trying to get the model to behave

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share