-
Posts
3056 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by rlackore
-
Part Of Exterior Wall Keeps Turning Invisible
rlackore replied to 4hotshoez's topic in General Q & A
You probably can't until you generate a window schedule and notice the extra entry. I took a guess that it was a problem with the window buy examining the dialog boxes for the wall, both in plan and elevation. If you examine the 3D representations, the framing for the wall goes missing at the window location. So I selected the window and deleted it. That's when I noticed there were two windows. Here's the plan view dbx that shows half the framing missing: and the elevation view dbx that shows half the wall missing: -
Can you explain your intent a bit more? There is no roof plane over the porch. Is this what you're trying to do?
-
When CA cuts a section, it generates Cross Section Lines (placed on an eponymous layer). The Cross Section Lines are what the dimensions will locate; unfortunately CA doesn't produce Cross Section Lines for everything. If you turn the Cross Section Lines layer off - dimensions won't locate anything, even thought the section appears unchanged. By assigning a bold color to the layer, you can see exactly what you can locate.
-
Part Of Exterior Wall Keeps Turning Invisible
rlackore replied to 4hotshoez's topic in General Q & A
There is an extra window pasted over the Pella 4859. Delete one of these windows and your problem should be fixed. -
Jim, When the problem arises, it is persistent across commands, saves, and sessions. Regardless of the Edit Behavior checkbox. From the reference manual: Note: Unlike other Preferences, the program always restores the Default Edit Behavior whenever you close the program. So, you'd think that closing/opening would resolve the issue. It doesn't.
-
...which is also a really strange behavior, isn't it?
-
Yes, but then I lose the very convenient fact that while the command is still active I can keep inserting polygons. I know, I know - inserting into a blank area, terminating the command, selecting and copying the polygon so I can start pasting is only a matter of a dozen clicks and keystrokes - but that's the way this forum evaluates CA, by the number of clicks and keystrokes.
-
Yep, got it. Thanks.
-
When I use the Regular Polygon tool (CAD>Boxes>Regular Polygon) I can only insert it into an open area of the drawing. If I move the cursor over (or close to) existing geometry or objects, the polygon disappears and when I click to insert the polygon the command terminates. Why do I care? Because often when I'm inserting a polygon I want to snap it directly to a known point on another piece of geometry. Is this the default behavior for this command?
-
Thanks for the clarification. Common enough, even outside of California.
-
What's a California Tie-in? Do you mean the method of hip framing?
-
If you have the room to provide a large heel height, you could probably achieve a true cathedral with sloping parallel chord trusses.
-
Activate the truss tool: Build>Framing>Floor/Ceiling Truss Now hold down the shift key and window around all the floor trusses - they will all be selected. This behavior works for all kinds of Chief objects; first activate the tool, then shift select.
-
Click on the Drawing Sheet Icon, or use the menu: View>Drawing Sheet.
-
What's The Best Way To Copy Some Finishes From One Plan To Another?
rlackore replied to zowie123's topic in General Q & A
Jim, The OP wanted a quick way to transfer a few materials from one plan to the other. 3D>Materials>Plan Materials (3 clicks) Select the material>Add to Library (2 clicks) Open the new plan, if it isn't open already (1 double click) Select the library browser (1 click) Select the material in the library browser (1 click) - you automatically have the spray can Click on the object to apply the material (1 click) 9 clicks 1 right click and 1 left click to delete the material from your bloated user library -
What's The Best Way To Copy Some Finishes From One Plan To Another?
rlackore replied to zowie123's topic in General Q & A
If the plan is stored on the same computer (where your user library is) you don't even have to export/import - the materials will just reside in your user library. I don't understand how it could be any easier than that. -
Transparent Fill For Electrical Labels- How?
rlackore replied to dhowardaia's topic in General Q & A
Curt you are correct. I missed that entirely. Thank you. -
Transparent Fill For Electrical Labels- How?
rlackore replied to dhowardaia's topic in General Q & A
That checkbox applies only to text boxes, which most labels don't use. AFAIK, only the Room Label uses a text box. -
Tools>Material List>Material List Polygon Edit the polygon for the shape that matches the extent of the flooring. Open the polygon's dbx, clear all checkboxes, then select just the flooring checkbox to assign that material to the polygon.
-
What's The Best Way To Copy Some Finishes From One Plan To Another?
rlackore replied to zowie123's topic in General Q & A
Save them to a folder in your user library, then export the folder as a library file, and import the library file into your new plan. -
Yeah, I understand. What I meant is that the basement is already subdivided into a whole bunch of rooms and I'd have to move a whole bunch of furred walls to select all the zero-area rooms.
-
Kind of works. Problem is I've go so many walls and openings and intersections that I can't do this unless I basically start from scratch. I'd already tried this, and it's probably my best bet. Unfortunately, I'll have to break the foundation wall in several places to assign new interior materials. Maybe I'll try modifying the foundation wall definition with a zero-thickness layer and assign it the interior finish. The strange thing is that not all of the basement rooms have this problem. It seems like CA should reference the innermost finish wall surface of a room to generate the Room Finish Schedule.
-
I'm really struggling with trying to put together a Room Finish Schedule. This is my first attempt, so doubtless I'm just being stupid. I'm furring out the basement walls, and when the furred walls are defined in the Wall Specification dbx as Structure>Furred Walls, the Wall Material displayed is for the concrete foundation walls: If I try to fix this problem by defining the furred walls as Structure>Frame Through, the Wall Material displayed is for the furred walls, but a zero-area room is created that cannot be selected to exclude from the schedule: Any insight would be appreciated.
-
No stretching in Chief. Select all the objects on one half of the plan and move them 1 inch. Adjust everything as necessary.