I am about pull my hair out on this deck framing issue. Every time I reopen the files where I have decks, the framing disappears. It gets old rebuilding it every time. What is up with that? That HVAC platform should have joists beneath and a couple 6X6's. Same with the front porch.

 

image.thumb.png.c1314d3b9d4a4c38177cca6a61836fa5.png

Link to comment
Share on other sites

And lock the layers.

 

Searched help for "retain framing" and got nothing.  But when a deck room is selected, there is a box that can be checked that says "Keep deck framing after deck room is deleted."

Link to comment
Share on other sites

you have to make sure that "automatically regererate deck framing" is check "on". If you have manually framed the deck...then this turns feature is turned "off"....and won't returrn until you check it "on". However...you will lose any custom deck framing you may have done. 
 

2024-08-27_19-48-45.thumb.png.741419520c33e9f07af758114e097819.png

  • Like 1
Link to comment
Share on other sites

Rob - you can "retain" framing...but, if you do then the "auto regenerate deck framing" does not rebuild your deck. So...if you manually modify the framing of a deck - which we all must do because the deck tool only gets things "close" - then you would open the deck room and on the structure tab select "retain floor/ceiling framing". But - your deck will not "rebuild" if you move a wall...just keep that in mind. 

2024-08-28_09-56-48.thumb.png.320854ca3ac8fc83575c6b150a4039da.png

 

Link to comment
Share on other sites

Can anyone tell us what closing and then reopening a file does to erase deck framing?

 

I lose deck framing even not closing a file, and never know why.

 

Decks are weird.  You lose framing but not the deck planking.  Lose a floor inside, and you're looking at the basement.  The floor finish is gone, too.  But whatever action wipes deck framing, leaves the planking alone.

Link to comment
Share on other sites

5 hours ago, SNestor said:

Rob - you can "retain" framing...but, if you do then the "auto regenerate deck framing" does not rebuild your deck. So...if you manually modify the framing of a deck - which we all must do because the deck tool only gets things "close" - then you would open the deck room and on the structure tab select "retain floor/ceiling framing". But - your deck will not "rebuild" if you move a wall...just keep that in mind. 

2024-08-28_09-56-48.thumb.png.320854ca3ac8fc83575c6b150a4039da.png

 

gotcha! I hate decks. 