Gr8trim4u

Members
  • Posts

    53
  • Joined

  • Last visited

Everything posted by Gr8trim4u

  1. I find myself with the drawing sheet open on my plans. I center the drawing sheet on the 0,0 seems to keep things better aligned. when you create a new floor sheet seems to stay stacked with no issues.
  2. This would be great also. I have a giant note on my drawings that say all openings are one stud and 2 jacks min. XOO OOX I am the guy trimming most of the houses I design.
  3. I have a bifocal situation also. My optometrist made me a set of glasses with a single script for my monitor distance. They have worked well. When I am in the field doing as built I have to switch back and forth. For long sessions the glasses work great.
  4. If you are building spec homes. Chief will allow you to render some pretty realistic designs. I use it to generate premarket concepts along with the 2d drawings for a couple of builders/flip guys. 8 out of the 9 was sold before we demoed the existing structures. The 9th one is pending contract. Specs are easier when you are not dealing with HO in the building process. however, it feels good knowing you have a buy. Chief allows you to manage the expectations also. You can show people pretty much exactly what they are getting. May take you a bit to get up to speed but its worth it.
  5. Steve Thx for the nugget on walls through ceilings.
  6. I had a bit of time today. I finished tracing the Wolf Poly ash trims we use on our jobs. I have been experimenting with placing flashing on the stacks. Mixed results. See attched jpg POLY ASH TRIM.calibz
  7. 2nd the g602. Its a great design and super comfortable.
  8. We are using wolf polyash trims for our lintel. Made of 4 pieces. Grab the pdf from wolf trace over them in cad add them to your library and you can stack them up how you need them. Pm me I will send what I have sketched up.
  9. I have been working around this problem with molding lines. In the effort to increase efficiency i trying to allow roof planes to manage the frieze. I am encountering the attached issue. Condition is to keep the overhangs the same depth and align the frieze. This is the issue on a small scale. I have larger plans that i wish to resolve on. x12 frieze issue.zip
  10. Gr8trim4u

    soffit

    Good evening all. I am usually lurking hardly post., this thread however piques my interest. 30 plus years designing and working in the field. About to wrap up the house i have attached the roof system for. This design was priced for trusses. It would not provide the client with what they desired within budgetary constraints. Mainly a non usable 3rd floor for double the money. I believe with careful planning and an understanding of point load transfers you can stick frame most roof systems. This home was designed so the load paths are pretty much not interrupted all the way to the ground. If you do not have confidence in the team you are using in the field to accomplish the task you need to find another team. Through out our industry everyone has become specialized. The term builder use to mean someone who could not only manage the job but could perform almost all the tasks. Today builder is the guy on the cell phone that only knows who to call. Those of us work in the field and behind the computer have an advantage we get to see if it worked or get to fix it if it doesn't. Stick has its place trusses have there place. Confident people in the field can make either work.
  11. Michael Michael Thx!!! I started with Chief architect version 98 not 9.8. it was on a 286 processor. I did enough jobs over the years but just enough to get by for what i needed . The older the body the more I do this. You guys have been a vast wealth of knowledge and efficiency Many thanx to all of you. .
  12. I did a search and all i come up with is doing it manually. Am i missing something. I would like to create the actual on the drawing . I have moved up to x10b
  13. Joseph Will it work on x10? Thx for the heads up. Anthony
  14. See the attached photo Mick's Suggestion. I am trying to show the Floor joist with lengths assigned. I am till getting a decimal return.
  15. Thank You Eric!!!! I will incorporate!!! Seems there should be a setting that allows you to change the format without a macro.
  16. From decimal to x' y 1/2" my default is in decimal inches. I cannot find the DBX to change it.
  17. x9 user 

    Builder, finish carpenter.

  18. Good morning all. I need some assistance in formatting my label dimensions. I want to go from this to feet and inches(not decimal) I have searched the videos and no avail. TIA Anthony Hayes