ACADuser

Members
  • Posts

    2856
  • Joined

  • Last visited

Everything posted by ACADuser

  1. That Preference setting to Grayscale is what I was missing. I see yellow in a gray shade now. And you don't have to turn color off in plan to send to layout, just turn color off in layout. Thanks Micheal.
  2. So you print in color with the color turned off?
  3. But don't you have to change all your line work to some shade of gray to make that work?
  4. OK figured it out. While the line weight is one, you can still set transparency to 90 with black grid & get the result I wanted.
  5. Thanks, Will but I want to print in B&W, While transparencies of 80-95% will print nicely for fills. line work will not accept transparencies. When printing in B&W ALL colors are changed to black including gray.
  6. Showing a steel rebar grid on the concrete floor using a ploy line hatched with grid & lightweight set to 1 & would like it faded. I do not want to change my plan to print in color. How do I do that?
  7. Thanks for the tip Joe, I'll give it a try.
  8. When using notes, labels & other non-room label schedules there seems to be a performance hit when panning & zooming with such a large number of schedule items. The Rich Text Labels with macros in them noticeably slow the program down. This is not evident with built-in room labels. Obviously, Chief did not plan on a 77 room house but using the program on commercial buildings is bring to light the programming shortfalls. We (I) need a way to stop the refresh of the Table & notes to speed things up. Window & door schedules are not as bad but I wait as late as I can to add them to the plan. So with visible schedules for room finishes, doors, notes, room numbers and windows the plan can be painfully slow for a 77 room plan. I often delay creating the window & door schedules to help.
  9. I have a Room Sch with room number & Room Name. Due to the size of the room label & the room itself, the room name is often shortened. Like Equip2 for Equipment 2. So in the Label needs the short one & the Schedule needs the long one. To complicate matters using custom room labels makes the plan too slow with 77 rooms on the 1st floor. I see extra columns in the room number schedule like "Code" & "Comment" but only see these referenced from the room in the material list associated with that room. Any solution to that issue?
  10. And if you have Autocad it is easy too. https://www.google.com/search?client=firefox-b-1-d&q=3d+text+autocad
  11. In a room, I have partition walls for workspaces. I set them to have No Room definition & Not in the schedule. The room has an exterior wall, 2 interior 4" walls & a room divider wall to define the room. In the Room finish schedule, the WALL MATERIAL column still has the finish of the partition walls on it. OK I fixed this by selecting all the interior walls & Ctrl-X. The schedule updated correctly. Then I paste in place, so far so good. This seems like odd behavior to me.
  12. https://3dwarehouse.sketchup.com/search/?q=green egg
  13. The only drawback is that you can not Mull overlapping windows & doors. I've tried side frames at 1.25" but you can not control one side separately.
  14. Nice job Jim. Would like to see the engineering on that retaining wall when you get it. That is a tall wall with a lot of soil behind it. Are you using a drain field with weep holes to control the water?
  15. This is what I get by changing all the frame to 2.5" and sash to 0.1" Use Ctrl Drag to move the window frames over the door frames
  16. This works too. https://www.chiefarchitect.com/support/article/KB-00284/reflecting-a-duplicate-of-a-plan.html Better results can be had by mirroring off to one side, not down the middle of the house.
  17. Though I would post my Autocad LIN file if anyone wants to try them. CAB2.lin
  18. Thanks fella's, that was it. Got me again. I keep forgetting about that layer.
  19. Does anyone know what layer the vertical lines outside of the door is? The walls are 2" wide, toilet stall walls. Door.plan
  20. Never would have guessed that one. Thanks When are we going to be able to edit the pull-down list?
  21. So where did the Strip Hatch go? It's Not the dbx pull down.
  22. My wife's uncle is in s similar predicament. But he stays at our house when he comes to town for treatments. I find work therapeutic most of the time but deadlines can be too stressful. Manage your workload.
  23. Hope you have a good outcome Ray.