-
Posts
900 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Evolution
-
Thanks Larry I will do that, as SOON as I can COME UP FOR AIR! I do THANK all the folks that jumped in now and in the past (I def have asked for a lot of help but not until I felt I had reached the end of the proverbial rope). I don't like using "WORK AROUNDS" when there is a viable answer somewhere, and as Glenn Woodward pointed out, you can definitely stumble over your own feet when you resort to work arounds vs using the appropriate tools/operations. SO, on to the next level (maybe)at least the client called and thanked me for the extra effort today to meet his dead-line. He is having the project printed now at the printers, and if I understood him he's going out for prelim bids / const budget! I'll be a happy camper when I can post photo's of the construction and finished project. Oh yes, what really was super great was he and his team ALL got the X6 viewer and are AMAZED when they view the plan with it. Thanks everyone!
-
Thanks Larry! I've a LONG ways to go! THE X6 Gremlins are STILL AT WORK!
-
I set it up based on the user guide KB etc. I know the zero page is the master, I don't know what else I NEED TO KNOW since I believe I FOLLOWED the instructions correctly? I'll do the paste thing.
-
Well Joe, I know it seems a simple process to the experts, but to this novice I can't even get that to work????? I thought I did it like you said, but after sending the sheet to layout, follow your steps but nothing changed?
-
BUMMER! They want me to include a pdf of the structural plan in my layouts, but HOW do I add a structural sheet? I go to the layouts, tools insert sheet but I can't change the page number to S-1 without going to the zero sheet then changing it there renumbers all my sheets with S? ANY quick help?
-
Opened floor plan, (set up schedule layer) turned everything off except schedules, loaded all schedules over again, sent to layout! It is there now. Did a complete back up of the entire plan, about to send to drop-box for the client! FINGURES CROSSED it all works!
-
grreeatttttttttttt!!!!!!!!!! GETTING ready to send everything to client and my schedules have ALL DISAPPEARED?????? I DON'T HAVE TIME FOR THIS!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
-
I am at the point of exhaustion, to bed at 3:10 back up at 7:30 now trying to figure out what happened to all the work I did last night/early am????? I followed the help link on the error link, but it doesn't work the way the help says it will. Thankfully, I went to the saved layout files, right clicked open and they were still there (but) I am SCARED to death with I do a complete back up, and/or pdf / print to file to send to the client and his disciplines to review (he has a meeting with the contractor and wants all I have ready). When I opened the help and tried to do as directed clicked on the ok and the dialogue just closes, it does not allow me to search for the missing files. Since I DID find the missing layout files, is there a way to save a back up of the saved (working) layouts????? or is that just another waste of time?
-
As luck would have it, working ALL NIGHT to get the redi-check CD's out the door (this morning). I thought I was following the help to the t-went to a elev section tools schedules inserted door, window, cabinet and finish schedules there. Turned off all layers except for schedules, sent to layout (sheet 5), wow did it look nice. Only thing, the elevation section view on page 4 now has schedules plastered all over it too! I opened tools layer management for that view and turned off schedules, but they're still there. I didn't want to try this before I asked the question, but I am assuming if I delete the offending schedules (which will also delete all the work I did on the elevation section) I can go back and just add the elevation section again and it won't affect sheet 5 which is nothing but schedules? That's what I get for being a NOVICE! I SURE AM TIRED!!! Think I'll take a quick nap?!?!
-
Attempting to do that, but so far the results are crazy and BOY is it taking a lot of TRIAL AND ERROR!
-
I understand the math, I was hoping I wouldn't have to go back and extrapolate to get what he wants. Glenn Woodward help extablish the original plot. Thnx David
-
Lake House Client wants me to set the default floor elevation (main floor =0 by default) to corrilate with the topo map elevation. elevation at corner of house for example is 900' so main level floor (+/- 36" above 900')=903'. When I attempt to edit default floor in edit default the floor elevations are greyed out. Do I have to change each rooms floor elevation in lieu of globally changing the defaul. I can't seem to find any other way to change it. Thanks!
-
How To Shrink The Plan File For Client Viewer
Evolution replied to Evolution's topic in General Q & A
I will give it a try. IS THERE A BOOK available "drop-box for Dummies"? -
Lake House client has the CA X6 viewer loaded on his Mac, and has viewed the plan I backed up and sent him. Now his ID wants to do the same, but, Both are asking if I can shrink the file to 10mb or less. Not sure exactly why, maybe their internet upload/download speeds? I haven't any experience with this operation in CA for file sharing, so any advice would be appreciated. As previously suggested by others on the forum, I am doing google-search but nothing exactly relating to this subject so far, except "never compress again" in drop box. I'm not sure that's the answer? The complete back up file (zipped) for sharing is over 17mb's. Thanks
-
We ALWAYS get a release signed (notarized) that you're not responsible for any errors, misrepresentations so on and so forth and that the contractor does not have intellectual ownership of the plan/design etc., etc. WHERE are the LAWYERS when you need them? Chasing patients with bad hip replacement joints?!?
-
So, THAT's what did it. I turned off auto rebuild terrain, because for some reason, I get the message something like, auto rebuild terrain, interpolating (something) etc., etc., I'm not sure what that is or how IT got turned on, but when it DOES do that it takes forever to go from one operation to the next, like moving a door then you sit and wait.
-
I added a terrain feature, on a back up plan to see how I could quickly modify the terrain on the Lake House plan and for some reason, I cannot get the Build Terrain icon to go away. I wouldn't ask if I KNEW how to get rid of it. I couldn't find anything under edit defaults, or tools, where else to look?
-
I have a sliver of ceiling that want stay put. It is at the point where I had used an invisible wall to separate the game room sections in order to get the ceiling height the same. That's because the room above has a step down which lowers the ceiling below, and when I tried to use the ceiling height in the game room to set the height all the way through the room the ceiling in the area under the step down, did just that, stepped down. In order to get the ceiling height the same, I added the invisible wall and set the ceiling height in both spaces until they were the same. Until just now, there was NO ceiling sliver, I am not sure what caused it to show up now. It is definitely there because I can color it withthe paint tool, but I cannot select it to move it into place; or delete it. I removed the invisible wall, and the ceiling drops down (the distance of the step down above which is natural) in that area. I tried using a room divider, and the ceiling raises back up but the sliver of ceiling comes back and is still there. I'm posting the plan along with the screen captures of the issue. Thanks! Current Progress Set 2.18.2015.zip
-
Thanks David! I thought I looked EVERYWHERE, but definitely not there!
-
Apparently, sometime during modifying a terrain feature, I must have turned on "interpolating" while building terrain, now every time I make a change on the plan, before I can move on I have to wait countless minutes for it to rebuild terrain/interpolate, can I just turn that off? how? or do I have to turn off auto rebuild terrain?
-
ME TOO! I'm not taking any more chances. I had auto save set for every 10 minutes on this plan (maybe over-kill) but now, although I left that on, I'm still saving with every update to the plan as I work on it.
-
Well ED, just a simple matter of removing the check from use room ceiling finish. I suppose I SHOULD HAVE KNOWN THAT, but not sure where I would have learned it. SOME ONE tell me it's in the user guide or manual. On to the next challenge! ;-)
-
Really not sure?!? I just opened the file I emailed to myself and copied/pasted the missing door/transom unit back in. It is fine now. I did experiment with save/close/reopen and everything is fine. I had a similar issue (when my boss was actually at my work station) I had to close the plan and reopen because of an error message that CA had stopped working. Upon reopening the message asked if I wanted to open the newer auto save plan which I did. Upon opening the boss noticed that ALL of the horizontal siding had changed to vertical. I selected a wall opened the dbx the material hadn't changed just the pattern direction from horiz to vert. I simply clicked on the mat'l image in the dbx and the direction changed back to horiz. Problem is, I had to go to each wall of the entire perimeter and repeat that operation. I was not able to group select and do it all at one time so I lost some production time. By the way, I set the default before starting the plan to Horizontal, and when I checked the default the pattern was horizontal, so I have no idea why it changed, I just know IT DID. Right now IT'S NOT WORTH me trying to find the cause/cure I just need to get the job done.
-
WELL! The CA X6 grimlins are at work again. I hadn't posted anything previously about disappearing work, although ever since I began the Lake House project (using X6) I have had work I did the day before, mysteriously disappear from my SAVED PLAN. I know I will most likely be asked to enter a ticket, and as my past luck has been with HD Pro products I will get the answer back that tech could not duplicate the same results. BUT, I am curious if I am the only "FREAK" CA user that has had the work they did, updated and save the day before missing upon opening the last updated plan file? YOU WILL ask the question, if it changed like that, then how did you come up with the good-bad copies of the plan, simple-I emailed that last plan (zipped file) to myself just in case. That plan opened ok, so why then did the plan I have saved to desk top have the elevation changes? I'M TELLING YOU it was the CA Grimlins! No matter, I've been saving each up date, as I learned it PAY's TO SAVE!!!! Now I can just simply copy and paste the work back in. But, either the Grimlins are imbedded in the software or Murphy (I'm not sure how he got my security code) decided to get involved! No matter it's just time, RIGHT?
-
Interestingly enough, I was recently chastised (of sorts) for attempting the original roof "manually" and several said they draw their roofs using the "auto-build roof tool" and adjust it manually. The BEST help on roof's yet, came from Glenn Woodward, who suggested using make roof plane polly line and in most (if not all cases) I wouldn't have the fumbling-stumbling roof problems I've had on the lake house plan that fixed (most of the big issues on my roof), which by the way was my first attempt at this large and complicated structure jumping from HD Pro 10 to CA X6. I imagine ALL OF YOU have started somewhere, to wind up where you are (using CA X whatever version) so I DON'T feel intimidated, I will improve with every mistake and probably learn to FIX most of them with the idea I AM NOT ALONE in the march toward perfection!!!!! I will stay with it until I fix it. Thanks!