winterdd Posted August 30, 2023 Share Posted August 30, 2023 Is there a way to arrange these in order (all the fixtures on floor 0 first and so on). I noticed the electrical schedule already does that. Link to comment Share on other sites More sharing options...
Chopsaw Posted August 30, 2023 Share Posted August 30, 2023 What happens if you make " Floor " column #2 ? Link to comment Share on other sites More sharing options...
winterdd Posted August 30, 2023 Author Share Posted August 30, 2023 7 minutes ago, Chopsaw said: What happens if you make " Floor " column #2 ? Same. I never use fixture schedules but was wanting to add it to the drawing this time. Link to comment Share on other sites More sharing options...
Chopsaw Posted August 30, 2023 Share Posted August 30, 2023 Hummm... X15 has sort orders for each column. You may need to do it manually in X13. Link to comment Share on other sites More sharing options...
Chrisb222 Posted August 30, 2023 Share Posted August 30, 2023 I don't use an electrical schedule but in the schedules I do use you can just click on a row and drag it up or down wherever you want. Also, there are up and down buttons that appear on the edit menu when you select a row. Link to comment Share on other sites More sharing options...
Chopsaw Posted August 30, 2023 Share Posted August 30, 2023 7 minutes ago, Chrisb222 said: Also, there are up and down buttons that appear on the edit menu when you select a row. I think that was a new feature in X14 Chris. And you need to select the object. Link to comment Share on other sites More sharing options...
robdyck Posted August 30, 2023 Share Posted August 30, 2023 All you need to do is move the floor column to row 2, then cut and paste the schedule. (ctrl-x, ctrl-alt-v). 2 Link to comment Share on other sites More sharing options...
Chopsaw Posted August 31, 2023 Share Posted August 31, 2023 58 minutes ago, robdyck said: All you need to do is move the floor column to row 2, then cut and paste the schedule. (ctrl-x, ctrl-alt-v). Thanks Robert. There is always some little significant step that I seem to forget. 1 Link to comment Share on other sites More sharing options...
winterdd Posted August 31, 2023 Author Share Posted August 31, 2023 2 hours ago, robdyck said: All you need to do is move the floor column to row 2, then cut and paste the schedule. (ctrl-x, ctrl-alt-v). Now that is weird.......what is the point of cut and pasting to make it work or even change columns? Oddly it worked. Thanks! 1 Link to comment Share on other sites More sharing options...
Chrisb222 Posted August 31, 2023 Share Posted August 31, 2023 15 hours ago, Chopsaw said: I think that was a new feature in X14 Chris. And you need to select the object. Ah, thanks, I was sitting on the back porch sipping an adult beverage when I wrote that, was going on memory And siggys don't show up on my phone so I didn't realize what version he was using. Probably should avoid the drink-posting. (Notice I didn't say drunk-posting, it is a weeknight ya know!) 1 Link to comment Share on other sites More sharing options...
Chopsaw Posted August 31, 2023 Share Posted August 31, 2023 25 minutes ago, Chrisb222 said: Ah, thanks, I was sitting on the back porch sipping an adult beverage when I wrote that, was going on memory Not a problem as it seems that it often takes a collaborative effort to come up the correct answer for things that don't seem to be in the manual. Link to comment Share on other sites More sharing options...