armfx89 Posted February 15, 2022 Share Posted February 15, 2022 Please see pic. This is the cross section of a house with a walkout basement. The front of the basement is just 2x6 siding wall resting on 4ft concrete wall buried below grade. How do I make the 4ft concrete wall under the basement front wall in Chief, given that I am already on floor 0??? Link to comment Share on other sites More sharing options...
glennw Posted February 15, 2022 Share Posted February 15, 2022 Insert New Floor 1 Link to comment Share on other sites More sharing options...
armfx89 Posted February 15, 2022 Author Share Posted February 15, 2022 1 hour ago, glennw said: Insert New Floor lol, thx! Never used Insert New Floor Link to comment Share on other sites More sharing options...
joey_martin Posted February 15, 2022 Share Posted February 15, 2022 Or simply take an elevation view and make the front wall 4' 1 Link to comment Share on other sites More sharing options...
Chrisb222 Posted February 15, 2022 Share Posted February 15, 2022 I do those all the time and like Joey I take an elevation view and drag the wall down. Drag-tab will allow you to enter an exact move distance. Then you get just the taller wall you want, and not anything else which may be involved when adding a floor. You can also place breaks in the wall to create a step footer if needed: 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now