Simpson WSWH


ACADuser
 Share

Recommended Posts

  • 2 weeks later...
  • 1 year later...

Hello, I know this is an old post but I am using this Simpson Strong Wall for a project and I am trying to figure out how to get the symbol to show up in a wall detail and framing schedule. I have checked the layer display and added the symbol to the schedule. The blank area between the overhead doors is the Simpson Strong Wall.

 

549518443_WallDetail.thumb.png.148e436d2e7ba2c2183364c4219ea77c.png

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share