TennVol Posted January 2, 2019 Share Posted January 2, 2019 If so, generally what/how do you charge? I see this as an extra service (therefore additional charge) and potentially giving away work product in a useable format, rather than PDF's or prints. The client in this case is the homeowner, not a contractor, so less of a possibility there, but still... This particular client is an engineer so has ACAD and is wanting to do markups / reworks in that. Hoo boy. Thoughts? Link to comment Share on other sites More sharing options...
Kbird1 Posted January 2, 2019 Share Posted January 2, 2019 Has he Paid for the Original Drawings ? If he is the Engineer of Record for the Project , then I guess you may have too depending on what has been Promised , but it isn't exactly a lot of work to export a 3D model to DWG so what to Charge extra, if anything, is a tough one. Though I'd protect myself if there was money outstanding at this stage since as you say it is work product in a use-able format. Link to comment Share on other sites More sharing options...
rlackore Posted January 2, 2019 Share Posted January 2, 2019 I suggest specifying within your contact what deliverables (prints, electronic media, etc.) are included, and which are an extra fee. If you charge by the hour, then I see no reason to charge for exporting CAD; but if you bill a flat rate or something similar, then I would charge a fixed fee. I assume your contract also has standard copyright language, and that your transmission of electronic media, whether by post or email, includes appropriate copyright language, use restrictions, disclaimers, etc.. Link to comment Share on other sites More sharing options...
Evolution Posted January 2, 2019 Share Posted January 2, 2019 I would also suggest you get a release signed by him, to protect yourself, if he SHOULD use the file for anything other than mark ups stating basically you are not responsible for errors or omissions based on improper use of the file etc. Link to comment Share on other sites More sharing options...
tommy1 Posted January 2, 2019 Share Posted January 2, 2019 Sometimes I'll give the client or builder a dwg but I have to be paid in full prior and I only give a conceptual plan with certain elevations. No construction plans, details or notes. I often don't charge but sometime times I do...just depending. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now