country Posted May 28, 2014 Share Posted May 28, 2014 I agree with everything you have noted Gene. The frost depth here this winter was 12' and frost walls, as you have described, are the norm for all our walk-out homes. Link to comment Share on other sites More sharing options...
DRAWZILLA Posted May 28, 2014 Share Posted May 28, 2014 Here is one problem with the way I did it, in putting the lower walkout floor on Floor 1, and the frostwall foundation under the exposed walls on Floor 0. I am unable to send a "clean" foundation plan to layout. I'll either have to send one like shown and CAD-draw the rest, or come up with another solution. The pic attached is of Floor 1, with a layerset done to shown footings and foundation wall main layer only. This is an ICF job. Gene, do you use reference sets to show things as you want them? Link to comment Share on other sites More sharing options...
GeneDavis Posted May 28, 2014 Author Share Posted May 28, 2014 Not so much, Perry. Have used it only for plot plans and roof plans. Will try to set one up for this situation. Link to comment Share on other sites More sharing options...
CJSpud Posted May 28, 2014 Share Posted May 28, 2014 Gene: The images below are a simplified example of how I do my ICF walkout basements. Most of the ICF projects I do have all the foundation walls ICF so that is what I am showing below. As Perry suggested, I will use reference sets to show other "stuff" as needed such as plumbing fixtures for DWV penetrations through the slab. For the basement floor plan, I will put the "additional" framed partition walls on their own layer so that they don't show on the foundation plan. Our area has a moderate seismic rating so I don't normally don't need structural engineering for the foundations provided I follow the manufacturer's and/or code prescriptive requirements for reinforcement, etc. I am perfectly happy with having my basement as the "0" floor level and don't see much benefit in having the basement as floor 1 and the frost walls and footings below on floor 0. I need to put in a suggestion for being able to snap dimensions to wherever we put breaks in the bottom of a foundation wall where footing steps are to be located. The same goes for the foundation plan view - we should be able to snap dimensions to the location of the footing/foundation wall step indicators . Please note on the last 3D image that I used a material region to show where the parge cote was to be applied over the ICF forms. I hadn't tried that before and it works pretty good. I could have used the same for the below grade portions of the foundation requiring water proofing and/or drainage protection board. Link to comment Share on other sites More sharing options...
ebdesign Posted May 28, 2014 Share Posted May 28, 2014 For split levels, etc, where the foundation ends up on two different flrs, I use a reference set w/ the layout foundation plan. That way you can define the room/flr hgts properly & keep Chief a happy camper. Link to comment Share on other sites More sharing options...