DRAWZILLA

Members
  • Posts

    8585
  • Joined

  • Last visited

Posts posted by DRAWZILLA

  1. 15 hours ago, Renerabbitt said:

    Adding to this as I've done extensive shortcut mods over the years.
    You can get some really trick setups if you set your hot keys up to take advantage of modifiers such as ctrl, shift, or ctrl+shift on a mouse that properly executes rollover/jamming
    Keep in mind there are a few key combinations that cause problem with this methodology. Here are my current keybinds:
    image.thumb.png.81498f41ef2b761121074b3414f8d4f4.png

    nice setup Rene, my problem is that in my old age, and having neuropathy in my fingertips, the mouse with all the buttons just don't work for me anymore, and I sometimes will hit the wrong keyboard keys also, so everything takes me longer to do.  I'm waiting for a thought process to be invented. at least my brain still works.

  2. 35 minutes ago, robdyck said:

    X14 is also mildly blurry compared to X13.

    Also, visually, lines of selected objects often appear as though they are off by about 1/16" which, makes me constantly wonder if something got bumped out of place. Then when I zoom in or check a dimension, I see it is in the correct place. Again, new to X14.

    I see the blurriness but when I actually print it it's perfectly clear.

     

     

  3. I don't think Chief will overbuild it automatically with an add on room. You still need to manually overbuild it using roof planes. the new tool is mainly just for the valley board as far as I know. I do these all the time and it would be nice if I asked the roof planes to overbuild automatically and cut off the overhang, and it did. When I draw an as built plan the roof is done on the main structure, and I don't want to rebuild all the roof planes so I must tie in the overbuild manually.

  4. Change the ridge size to the same as rafter size and it will rebuild correctly. Ridges, ledgers and hips are the same when they should be different DBX's, t hen change the ridge after you turn off auto framing. Chief has been like that as long as I can remember.

  5. I usually don't charge any more than my usual s.f. price for exterior embellishments, what I do charge more for is major changes, like "let's move the addition to the other side of the home". I tend not to look at how long it takes me to do as I have always charged by the s.f. with add-ons depending on different things, so everyone knows up front. Win some and lose some.