joey_martin Posted February 8, 2016 Share Posted February 8, 2016 Anyone know if this has been reported as of yet. Beam "pocket" cuts through the entire foundation wall. Link to comment Share on other sites More sharing options...
MPDesign Posted February 8, 2016 Share Posted February 8, 2016 I am getting the same result. Will send a report. Good catch Joey Link to comment Share on other sites More sharing options...
MPDesign Posted February 8, 2016 Share Posted February 8, 2016 Hey fellow users I looked at this again and if the beam pocket is no more than half way to the exterior of the wall. It doesn't cut the foundation wall. I suppose this makes sense, most pockets are only 4 inches deep. Link to comment Share on other sites More sharing options...
joey_martin Posted February 8, 2016 Author Share Posted February 8, 2016 You are correct sir. Changed the length 1/2" and all is well. Link to comment Share on other sites More sharing options...
Greg_NY61 Posted February 8, 2016 Share Posted February 8, 2016 You should have 1/2" space around it to meet the code and it should be wrapped so its not in direct contact with masonry if it makes any difference to show that or note that on your drawings. Link to comment Share on other sites More sharing options...
joey_martin Posted February 9, 2016 Author Share Posted February 9, 2016 I take care of it with a note Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now