gravattedesign Posted February 1, 2022 Share Posted February 1, 2022 This is a recent issue in X13 premier. I have found a need to create a separate default set to handle layer settings for 3D Elevation view versus a plan view. I needed to show Electrical in the 3D view. When I created the separate default set, For the SAME schedule of Bath Notes, I got this result. The Default sets are used respectively for a plan view at 1/2" scale AND a 3D view at 1/2" scale with only a change in displaying electrical. Does anyone know about this anomaly and why the Notes are getting double numbers? Again, there is only ONE schedule referencing the placed custom Notes. Thank you for the assistance. Link to comment Share on other sites More sharing options...
Solution gravattedesign Posted February 1, 2022 Author Solution Share Posted February 1, 2022 To All... I figured it out. In the Project Browser under the list of Schedules, there was a second schedule created that used the SAME Note assignment. In my Case it was a Custom Note Style called "Bath Notes". Once I deleted this extra schedule from the list, the Notes updated with a SINGLE number. Link to comment Share on other sites More sharing options...
Dermot Posted February 1, 2022 Share Posted February 1, 2022 Double callouts, or numbers in the note schedules, almost always means duplicate schedules. See this tech article for some more info: https://www.chiefarchitect.com/support/article/KB-02968/removing-duplicate-callout-labels.html Link to comment Share on other sites More sharing options...
Joe_Carrick Posted February 1, 2022 Share Posted February 1, 2022 Yep, it's always 2 separate schedules. Link to comment Share on other sites More sharing options...
Renerabbitt Posted February 2, 2022 Share Posted February 2, 2022 2 hours ago, gravattedesign said: default set FYI you do not need to have a separate default set to accomplish what you are trying to accomplish. You could do this by editing your active views selected defaults. Link to comment Share on other sites More sharing options...
gravattedesign Posted February 7, 2022 Author Share Posted February 7, 2022 Renerabbitt, Could you elaborate on your comment about editing "Active Views selected defaults" ? I believe you are referring to my creation of TWO separate default sets for 1/2" scale for a plan AND a 3D view. The reason I did this was more about Layer Control with Electrical Fixtures turned ON or OFF, such as Wall mounted lights that clutter up a plan view when there are outlets below. Thanks for any additional advice or clarification. Link to comment Share on other sites More sharing options...
gravattedesign Posted February 7, 2022 Author Share Posted February 7, 2022 On 2/1/2022 at 5:32 PM, Dermot said: Double callouts, or numbers in the note schedules, almost always means duplicate schedules. See this tech article for some more info: https://www.chiefarchitect.com/support/article/KB-02968/removing-duplicate-callout-labels.html Excellent Dermot. Thank you! Link to comment Share on other sites More sharing options...
gravattedesign Posted February 7, 2022 Author Share Posted February 7, 2022 Thank you Joe for the Feedback. Peace Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now