Recommended Posts

Can someone either point me to the answer in the manual...or tell me why my NOTES callout has two numbers.  See attached picture.  I'm sure it's something simple...but, I give up.

 

2020-04-21_17-08-01.thumb.png.563ae9ff6fcb86629afedeaa453d78e0.png

Share this post


Link to post
Share on other sites

I seem to remember this being discussed recently, Steve, but I don't remember what thread. I know this isn't much of a help, but may jog someone's memory that does remember - getting older you know.:)

Share this post


Link to post
Share on other sites

@SNestor

It usually means that note is in 2 schedules, however, I just ran into the same problem and I know for a fact, I only had one. I think there's a bug when more than one note schedule for different types of notes are being used. 

  • Upvote 1

Share this post


Link to post
Share on other sites

In my case, I had used a note schedule for Exterior Materials, with only that type of note showing. Then, when adding some notes to my foundation plan, again using a dedicated note type, it gave me note #26 and #1. The project browser showed only 1 schedule so go figure. And I was definetly careful to ensure that only the correct type of note was included in the appropriate schedule.

Share this post


Link to post
Share on other sites
7 minutes ago, robdyck said:

@SNestor

It usually means that note is in 2 schedules, however, I just ran into the same problem and I know for a fact, I only had one. I think there's a bug when more than one note schedule for different types of notes are being used. 

 

I'm working on a new template...so, possibly I am sharing the same note schedule. I'll check that...thank you!

Share this post


Link to post
Share on other sites
12 minutes ago, robdyck said:

@SNestor

It usually means that note is in 2 schedules, however, I just ran into the same problem and I know for a fact, I only had one. I think there's a bug when more than one note schedule for different types of notes are being used. 

 

That was it...I had placed two schedule.  Thanks @robdyck

  • Like 1

Share this post


Link to post
Share on other sites
17 minutes ago, SNestor said:

 

That was it...I had placed two schedule.  Thanks @robdyck

Glad it helped!

  • Upvote 1

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    28624
    Total Members
    9156
    Most Online
    JamBell
    Newest Member
    JamBell
    Joined
  • Similar Content

    • By Elvis1111
      I am trying to figure out if there is a way to make a framing schedule for the entire project, and not just wall by wall. 
      We are finding that framing schedules do a better job listing out the members and sizes then the material lists. 
      Thoughts/suggestions? 
    • By hhdesigner
      I'm having trouble with the column width on schedules. I added and deleted some columns, set to auto height and width and all except the comments column size properly.  I have tried searching help etc., and haven't found any information on this problem.  I believe my computer recently updated windows 10, could this be a factor? Have tried restarting as well

    • By ChiefuserMathews
      how can I add custom notes to the library so that I can use in other layouts
    • By ChiefAR-MARGARET
      I have spent hours trying to create note schedules for my layout. I cannot get rid of the 1st note schedule I created in my elevation. I have deleted everything and started over, opened new plans, tried to copy and paste, cad detail, etc. But it just isn't working! Every new note references other notes that are deleted, turn off, etc. And there are no videos to address this. They only show you how to do 1 note schedule. Thank you!
    • By Doug_N
      Is there a way to add comments to a room schedule.  I would like to include "existing" or "proposed" to any given room.