GTdraftingdesign Posted September 4, 2017 Share Posted September 4, 2017 Hi, What is the setting to start the framing on the outside edge of the foundation wall? Apparently, mine is set so that framing starts at 3/8" in. Link to comment Share on other sites More sharing options...
DRAWZILLA Posted September 4, 2017 Share Posted September 4, 2017 You probably have your wall definition set to align with the exterior finish, change it to the framing. Link to comment Share on other sites More sharing options...
GTdraftingdesign Posted September 4, 2017 Author Share Posted September 4, 2017 Ok, My walls were set up as pony walls for step foundation. Aligning pony walls to Main Layer Outside worked. Thank you. Link to comment Share on other sites More sharing options...
Kbird1 Posted September 4, 2017 Share Posted September 4, 2017 is it not normal where you guys are to have the plywood/OSB flush to the foundation? we set a 1x2 into the concrete at top of Conc. line so the plywood can hang down over the bottom plate / concrete connection. Link to comment Share on other sites More sharing options...
Ridge_Runner Posted September 4, 2017 Share Posted September 4, 2017 3 hours ago, Kbird1 said: we set a 1x2 into the concrete at top of Conc. line so the plywood can hang down over the bottom plate / concrete connection. Not sure where GTdraftingdesign is located (sure would be nice to know a real name), but he may be in an area like I am where almost all of the foundations are concrete block. We almost always flush the mudsill and framing to the outside of the block with the OSB just down over the top of the block. Link to comment Share on other sites More sharing options...