RobWhite

Members
  • Posts

    191
  • Joined

  • Last visited

Everything posted by RobWhite

  1. I need to draw the 70x45 roof battens placed over the truss top cord. I understand chief general draws this details as blocks between trusses, but this is not how we do it in Oz. If I thinken the roof sheet to 61mm (i.e. 45mm battens + 16mm roof sheet) so i can then manually drawings the batten in the section this works OK. But doing this method the eaves gutter also drops by 45mm. I don't want this to happen. It there a training video for this or does anyone know of a method?