Sign in to follow this  
ChiefChris1

SCHEDULE Questions

Recommended Posts

I bet this has been discussed quite a bit....but it not, here goes. 

HOW does CA order the items in a schedule?? 
And, is there a way to reset the schedule numbers so they make sense on the plan?
I don't want to do the schedule - to - text function because then the doors/windows etc aren't linked to the schedule anymore and do not update if they are changed. 

But, how do the number/labels on the schedule generate in reference to the plan?  Most recently, door #1 is on floor #2, then door #2 is on 1st floor...and it just jumps all over.  I see no reason or apparent function as to which items are numbered in which order when using the schedule tools

.

 

Share this post


Link to post
Share on other sites

There are at least a couple ways to do this:

 

1.  Select the schedule and use the edit handles in the number column to move any given item up or down to where you want it on the list.

 

2.  Select the item and use the Move Down In Schedule or Move Up In Schedule tools (found in the edit toolbar).

Share this post


Link to post
Share on other sites

You can click on the schedule then drag an item up or down to change it's number-if you have done a lot much adding/deleting of items in the schedule it's a good idea to right click-renumber schedule first so you only have to drag things once.

Can also set up schedules by room or floor if you need to.

post-85-0-65500400-1457368375_thumb.png

Share this post


Link to post
Share on other sites

Well....for crying out loud.  HOW LONG have we been able to drag schedule items up or down??  How many releases ago did THAT feature happen? 

That's pretty stinkin awesome...I am hoping this is a new feature, because if it's not I am going to kick myself for the last 6+ years of scheduling.  :wacko:

 

Thanks Mike and Mark

Share this post


Link to post
Share on other sites

Well....for crying out loud.  HOW LONG have we been able to drag schedule items up or down??  How many releases ago did THAT feature happen? 

That's pretty stinkin awesome...I am hoping this is a new feature, because if it's not I am going to kick myself for the last 6+ years of scheduling.  :wacko:

 

Thanks Mike and Mark

 

You bet,  and I hate to tell ya, but I think we've been able to do that for quite a few versions now.  I think we all have those little things though that it seems everyone but us has known about forever. 

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
Sign in to follow this  

  • Member Statistics

    27825
    Total Members
    6254
    Most Online
    ChiefDallas
    Newest Member
    ChiefDallas
    Joined
  • Similar Content

    • By HDbyJustin
      Hello everybody. I have recently made the jump from the Home Designer Pro series to Premier X12. I have a client that wants the windows to be labeled with letters instead of numbers. I have not seen a way to change that but am I missing something?
    • By BuildingVision
      I'm sure this is simple, but I can't figure it out.  I'm new to Chief Architect...
       
      How do I get the callout labels to be smaller, like 1/2 the size they are showing on the image I have attached?  I am referring to the appliance and cabinet callouts.  I can't figure out where those text sizes are controlled. 
       
      I appreciate all the help!

    • By dskogg
      I want to show a window schedule for each elevation only showing the windows on that elevation, what is the best way to do this?
      This way i can show the sq footage of windows on that wall exposure and have it totaled in the schedule for just that wall.
    • By robdyck
      There must be a way to alter or control the vertical spacing of schedules. I've included the exterior elevation view of windows in my schedule, and there's a lot of wasted space between each row.
      Does anyone know if that can be adjusted?

    • By cjanderson66
      I seem to be having a problem that I am at my wits end with.  It appears that my plan is showing double callouts for all my windows and I can't seem to figure out how to get rid of them.  I have tried deleting my window schedule and then inserting it again but nothing.  Has anyone else had this issue before?
      Sosine NFP.pdf