Room Finish Schedule


winterdd
 Share

Recommended Posts

10 hours ago, mtldesigns said:

If I had to do one, I'd do what Dustin suggested.  Do you have to do these on all your houses Rob, or is this a customer request?  I've never been asked to do one is why I ask.

This is for a law firm job I am doing so I need to add a room schedule on this drawing because many of the offices will have different finishes.

Link to comment
Share on other sites

3D > Materials > Plan Materials, select the floor finish you want to rename, copy it to make a new material, call it whatever you want, maybe ROB 3-4-5, and then change the rooms to have the new shorter-name flooring, which will look the same as the one you copied.

  • Upvote 1
Link to comment
Share on other sites

6 minutes ago, GeneDavis said:

3D > Materials > Plan Materials, select the floor finish you want to rename, copy it to make a new material, call it whatever you want, maybe ROB 3-4-5, and then change the rooms to have the new shorter-name flooring, which will look the same as the one you copied.

Thanks Gene......I was way off. Funny thing is I was able to go into the room dbx and change the molding names easily.

  • Like 1
Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share