gelbuilding Posted December 21, 2023 Share Posted December 21, 2023 How to remove balustrade around top of stairwell and place custom upright timber Link to comment Share on other sites More sharing options...
glennw Posted December 21, 2023 Share Posted December 21, 2023 Define the railing as invisible - you will need some sort of wall/railing to maintain the opening. Or...the better way: Define the railing so that it builds like your detail with only the vertical timbers (balusters). Easy to add a top and/or bottom plate (rail) if needed. 1 Link to comment Share on other sites More sharing options...
gelbuilding Posted December 21, 2023 Author Share Posted December 21, 2023 Hi Glen, Thanks. How do i create stairs like this below? Link to comment Share on other sites More sharing options...
glennw Posted December 21, 2023 Share Posted December 21, 2023 Can you be a bit more specific. What exactly are you having trouble with? Link to comment Share on other sites More sharing options...
GeneDavis Posted December 21, 2023 Share Posted December 21, 2023 Looks like solid concrete stairs, rounded nosings, backbeveled risers. Looking forward to the Chief wizards to show us the way. Could be done in solids. Rene could do it in cabinets. Link to comment Share on other sites More sharing options...
gelbuilding Posted December 21, 2023 Author Share Posted December 21, 2023 Im not able to connect the stairs with correct amount of treads. Link to comment Share on other sites More sharing options...
gelbuilding Posted December 22, 2023 Author Share Posted December 22, 2023 Bit of perseverance and i got it. How do i bring the floor over to connect to the stairs? I made a room polyline to connect the floor to stairs but not sticking. Any suggestions? Link to comment Share on other sites More sharing options...
glennw Posted December 22, 2023 Share Posted December 22, 2023 You need to move the wall/railing that defines the floor opening for the stairs. A room polyline doest have anything to do with the floor opening unless you convert it to a Hole In Floor Platform. You could also use Build>Floor>Hole In Floor Platform to define a floor hole if you dont want to use walls/railings. Link to comment Share on other sites More sharing options...
gelbuilding Posted December 22, 2023 Author Share Posted December 22, 2023 Thanks Glen, Yes i realised that. Lastly i cannot continue the stairs up the building. I coppied and pasted (hold position) up a floor though doesnt seem to go up to that floor always goes to bottom floor, any suggestions? Link to comment Share on other sites More sharing options...
glennw Posted December 22, 2023 Share Posted December 22, 2023 The stairs should automatically find the upper floor and snap to the floor height. You can do it manually by opening the stair dbx and unchecking Automatic Heights and then manually enter heights. Link to comment Share on other sites More sharing options...