are there any tricks to create block and masonry walls to course intervals?
trying to accurately model cmu foundation walls to match full block and half block intervals
I started with setting grid snaps to course intervals, but figured it won't hurt to ask how others go about 

Share this post


Link to post
Share on other sites

The block you see is a material and the pattern and texture may be adjusted like any material.

 

And Grid Snaps have nothing to do with materials.

Share this post


Link to post
Share on other sites

im talking more along the lines of floorplan wall length intervals vs the visual material texture. 

could just do the math..  but didn't know if there was an easier way or how others might go about taking waste/labor/overall vision into consideration during design phase

trying to figure out how to convert what I know in one program to CA.  example of what I'm talking about.

 

 

Share this post


Link to post
Share on other sites

Open the pattern and adjust the verticle offset.

Before.....

image.thumb.png.6f7adb882760c42836b47df897ba9938.png

image.thumb.png.07fb7bed5a0e19ff7f5332675868f612.png

 

After...

image.thumb.png.bce7fbc144050effd458b7a031ea3183.png

Share this post


Link to post
Share on other sites
20 minutes ago, joey_martin said:

Open the pattern and adjust the vertical offset.

 

You can also adjust the horizontal offset if you want it to display just so.

Share this post


Link to post
Share on other sites
1 hour ago, mazakintegrex said:

im talking more along the lines of floorplan wall length intervals 

 

I did not watch the entire video, but it starts out showing 3D and not plan.

 

I'm guessing you want to constrain wall lengths to block length increments so the wall is built from full and half blocks.

 

What happens when you set the Snap Grid to 8"?

Share this post


Link to post
Share on other sites

thanks to all!

26 minutes ago, solver said:

What happens when you set the Snap Grid to 8"?

once a wall is drawn off grid, it will not allow re-snapping to a grid line with a wall drag move- it moves at increments in which the grid distance is set?

other than redrawing the plan, point to point move or dimension line the only way to get back on track?

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
Sign in to follow this  

  • Member Statistics

    29339
    Total Members
    9156
    Most Online
    ianianianian
    Newest Member
    ianianianian
    Joined
  • Similar Content

    • By JasonMWebb
      Is there a way to generate the vertical cell reinforcement objects in a CMU foundation plan? I am looking for something along the lines of what is in this diagram (from another system). It is a common requirement for foundations. Please refer to the small squares grouped at the corners of the foundation drawing attached. Note that I am using Chief Architect Premier X12 (latest build).
       

      The detail drawing for this object would look similar to this:

    • By Potential_Custmr
      Hi,
       
      I am trying to find someone who uses Chief Architect that is familiar with the ShelterWorks FasWall ICF product and has actually used it in a design. Can anyone on the forum help me?
       
      Thank you in advance for reading this and helping,
       
      Robert