I was wondering is there a way to rename a symbol so that the name appears in the schedule will be as required rather than the CA symbol name. eg. 2 way ceiling register, I want to rename it as supply air to reflect in my schedule. Is it possible? Any suggestions how i can achieve that?

Share this post


Link to post
Share on other sites

Is this a trick question?

 

Open it and rename.

Share this post


Link to post
Share on other sites

Are you renaming in plan or the library?

 

If the object is already in the plan and you rename it in the library, only the library changes.

Share this post


Link to post
Share on other sites

Thank you Eric for the info. I renamed it, but didn't realize I had to replace it in the plan. It worked now as you instructed. Thank you Eric.

Share this post


Link to post
Share on other sites
2 hours ago, ChiefuserMathews said:

I renamed it, but didn't realize I had to replace it in the plan.

Just to be clear, the symbol in the plan didn't necessarily need to be replaced.  You could have just renamed the symbol in the plan.

Share this post


Link to post
Share on other sites
55 minutes ago, Alaskan_Son said:

Just to be clear, the symbol in the plan didn't necessarily need to be replaced.  You could have just renamed the symbol in the plan.

Just a slight point to add as I have seen this basic situation twice today.  Once you have placed the item it is no longer tied to your user library and becomes a placed object in the plan.  Deleting the item in your user library or changing it in any way does not change the already placed item in your plan file or any others.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    29110
    Total Members
    9156
    Most Online
    Richwood
    Newest Member
    Richwood
    Joined
  • Similar Content

    • By ChiefuserMathews
      Hello, do we have batten board symbol in CA as wall type as shown in the section attached?

    • By wazzubrad
      I am looking for a solution on how to insert schedules into Layout. I have tried converting the schedule while in a Plan to a Cad block and then inserting into layout by Copy/Paste, but this deleted the Note # specific to each line item and I would then have to manually add them for each line item on the layout page.
       
      Here is a picture from a Chief layout where I have blue circled the schedule showing that Chief has inserted it into layout. Any ideas?
       

    • By nick9645
      I'm looking for a Gas Range symbol or how to callout a Gas Range on a MEP Plan.
      I tried searching google and this site all I got was Line drawings for a range.
       
      Thanks,
      Nick
    • By ChiefuserMathews
      Hello, Is it possible to create a ceiling assembly schedule in CA? I could not find one, nor an option to assign to a custom schedule. Any tips?
    • By verticalworks
      We have limited space on our layout page and more pages than can fit. I cannot seem to find a way to do columns. The only option is to shrink the font but that will not be an option as the city requires a minimum font size. All I can come up with is to do a manual text box. This seems like there should be an easy solution to this as I know plan sets that are 60-80 pages and you would need multiple columns to show all the pages. Thought?