Electrical Schedule


EsteeChief
 Share

Recommended Posts

That is the only problem with the schedules with all of them, if you have different floors put the make a schedule for each floor. put them on that floor and that will shorten them 

  • Upvote 1
Link to comment
Share on other sites

What I would do is make a copy of the plan on the layout page, then one of the copies select it and select the scale tool and make it not to scale then you can move the selected boundy and move them until only the that schedule is showing and then up the top icon select the resize icon and adjust to fit the only thing that happens is it is not to scale

Link to comment
Share on other sites

Same answer as the other thread:

I know how to easily resize the schedule in both directions at once if that helps.

Select the schedule, shift select the symbol again.

Grab the small top centre grip and drag it down.

Link to comment
Share on other sites

  • 1 month later...
  • 4 weeks later...

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

  • Member Statistics

    30404
    Total Members
    9156
    Most Online
    willmick
    Newest Member
    willmick
    Joined