Hoff_Design

Members
  • Posts

    274
  • Joined

  • Last visited

Everything posted by Hoff_Design

  1. This was the option Discovery Church went with.
  2. Discovery Church wanted me to design the space in their sanctuary two ways, one showing the stage on the side wall and the other on the back wall. This image is side wall. They ultimately went with the back wall (verticle images)
  3. I converted a Coors beer warehouse into a church, This was the design they went with, and now it is a thriving hub.
  4. I added a two story office addition to this existing building...but still had to model the existing structure. Will be working on spicing up the exterior next. PS: Everyone should have their own front loader.
  5. Challenges for this project were modeling the large beams overhead and importing the machines at a polycount that would not crash the program. Each machine had a polygon count of over a million. I ended up using Lightwave 3D to import them and gut them, and was able to bring the count down to about 16k per machine, and kept the mapping regions for materials intact. I have not yet created or applied textures to them, but for this project that was not important. It was important that the scale and placement were correct and now we can arrange them in the space as needed.
  6. Hoff_Design

    Commercial Design

    Example of some of our design projects on the commercial side of things.