Thanks for the responses. I have quite a bit of work done on the default cad layer but I did it when I was on 0 floor, (basement), level. I am trying to figure a way to get all that work to show up on the 1, (main floor), level. I found instructions on how to copy from one layer to another but is there a way to copy from on level to another? Thanks again.