SIMPLYDESIGNNC

Cabinet Schedule

Recommended Posts

Hello All-

 

I am generating a cabinet schedule but would like to list each cabinet separately.  I notice that if I have two of the same cabinets, the schedule lists as Qty 2.  Is there a way around this feature?

 

Any help would be appreciated!  Thanks!

 

Jamie

Share this post


Link to post
Share on other sites

In the Cabinet Schedule dbx (General Panel), uncheck "Group Similar Objects".

Share this post


Link to post
Share on other sites

You can also change one thing, like the name(label) to get things to list separately, if you  already have Joe's method in use.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27449
    Total Members
    6254
    Most Online
    DesignerPro2020
    Newest Member
    DesignerPro2020
    Joined