Design phase/layer - Home then finished basement


 Share

Recommended Posts

Is there a way to do a design in Home Designer Architectural where I can keep the home build separate from a finished basement? Im going to sub out the construction of the home, but will finish out the basement once Im moved in a year or so later.  I'd like to be able to turn off the finished basement in my model to only show the unfinished portion that I'd contract out but still be able to design the layout. 

Link to comment
Share on other sites

You could put everything for the finished basement in a separate layer set or you could just create a second file for the basement only.

Link to comment
Share on other sites

10 hours ago, DBCooper said:

This is very doable in Premier but I think in Home Designer Architectural you are going to have to do a save as and just delete the stuff you don't want to show.

 

Im considering updating to HD professional anyway.  How would you do it if it were pro?

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share