DeLayDesign Posted May 7, 2023 Share Posted May 7, 2023 Hey experts. Here in Chicagoland we do a lot of dig downs to create a better head height for basements that were built short. I have my work arounds to show this properly, but I've always wondered if there is a better way. So - how would you tell chief to do this? Thanks in advance! Link to comment Share on other sites More sharing options...
rlackore Posted May 8, 2023 Share Posted May 8, 2023 Set up your basement normally, then remove the floor structure. Add a manual slab for the new floor. Add a molding polyline for the footing overpour. Cut a section and autodetail and/or add CAD as necessary. 3 1 Link to comment Share on other sites More sharing options...
rlackore Posted May 8, 2023 Share Posted May 8, 2023 To whomever, a down-vote is worthless feedback. Tell us why, and provide your solution. 1 Link to comment Share on other sites More sharing options...
Chrisb222 Posted May 8, 2023 Share Posted May 8, 2023 16 minutes ago, rlackore said: To whomever, a down-vote is worthless feedback. Tell us why, and provide your solution. Anonymous downvotes suck. I offset it (might need you to reciprocate in a minute lol). I got three reddies the other day for posting a WORKING solution. Granted, it turned out to not be the best method but this was AFTER I went back and added the better solution. This place is a circus sometimes. Now somebody hit me!! 1 1 Link to comment Share on other sites More sharing options...
Chrisb222 Posted May 8, 2023 Share Posted May 8, 2023 23 minutes ago, rlackore said: To whomever, a down-vote is worthless feedback. Tell us why, and provide your solution. Btw, I'm not suggesting there's a better way for this problem, I think your solution is fine and have nothing better to offer. Link to comment Share on other sites More sharing options...
DeLayDesign Posted May 8, 2023 Author Share Posted May 8, 2023 7 hours ago, rlackore said: Set up your basement normally, then remove the floor structure. Add a manual slab for the new floor. Add a molding polyline for the footing overpour. Cut a section and autodetail and/or add CAD as necessary. @rlackore - yep, pretty much my solution too. I wasn't sure if there was a way to tell Chief to push the floor below the footing; would be great to incorporate this into a future build @ChiefArchitect Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now