GeneDavis 152 Posted February 17 My floor framing defaults have 1-1/8" engineered wood for rims, but for the decks I want plain ol' solid-sawn 2x lumber. What's the workaround? Frame all floors before decks, change spec for rim, then autoframe decks last? Share this post Link to post Share on other sites
Chopsaw 676 Posted February 17 Yes unless they fixed it for X13. Share this post Link to post Share on other sites