Keep schedule, change swing of mulled door


Tdgdesign
 Share

Recommended Posts

Is there a way to explode a mulled door unit but keep the schedule from updating itself? I need the door in the attached image to remain a D13 but also need to reverse its swing. When I explode it to change the swing it becomes D1. This wreaks havoc on the rest of the drawing set - specifically my elevations which are all CAD details and not live views...

door tag'.jpg

Link to comment
Share on other sites

9 hours ago, Chopsaw said:

You should be able to reorganize the schedule after you finish your revisions.  Just select the schedule and grab the control handle in the Number Box and slide it back to position 13.

Well well! I had no idea you could even do that! Thank you sir! 

Link to comment
Share on other sites

On 8/7/2019 at 9:48 AM, Tdgdesign said:

Well well! I had no idea you could even do that! Thank you sir! 

 

There are also up and down arrows in the lower tool bar to rearrange schedule items. Can be used to clean up schedules with gaps in the numbering sequence.