Move manually-drawn piers from level 1 to level 0


GeneDavis
 Share

Recommended Posts

I think Piers need a Foundation Wall ( Containing Object?) and it be set to use the Grade Beams and Piers type......unless you draw your Own Piers with P-Solids?

 

But not an error message I have seen before..... in the past I have drawn my own as the Grade Beam Default foundation was too limiting.

 

M.

Link to comment
Share on other sites

It is the issue I said above, the Foundation Piers need a ground beam or foundation wall then you can copy and paste (hold position) to level 0....but it doesn't look right , I'm not actually sure how you added Piers to a framed Walled like that....

 

so better to delete them and drawn your own like under the deck.... or copy and paste them from the deck...

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share