change number in cabinet schedule


renom3
 Share

Recommended Posts

1.  To renumber the Cabinets, just move them up or down in the Schedule.

2.  Partitions and Fillers would only be included in the Schedule if you use an actual Cabinet.  Once you customize a Cabinet to the configuration you want then add it to the Library and you can use it in the future.

Link to comment
Share on other sites

1 hour ago, Dermot said:

2.  Manually placed fillers will show up in the cabinet schedule.  Automatic ones won't.

Thanks for the clarification. 

  • It's an important distinction - most cabinet manufacturers simply add a 3" extension where a filler might be needed.  They then get trimmed in the field as needed.
  • It would be rare (IMO) for a manual filler to be specified or ordered - except for frameless cabinets..
  • It would be nice if there was a way to have the "extension(s) - right/left" to be automatically included in the schedule.  OTOH, using the OIP in X9 allows such things to be added as notes.
Link to comment
Share on other sites

For a Partition, start with a Cabinet.

  • Edit the width, height & depth
  • Edit the face elements.
  • Save to Library

Whenever you use that in a Plan it will be included in the Schedule.

Note that you can modify the CODE, DESCRIPTION, COMMENTS & MANUFACTURER in the OIP to provide more information in the Schedule.