hi

a)

can i change the number in cabinet schedule ?

i want to tell my number by myself

 

B)

how can i include partition and filler in cabinet schedule ?

 

thanks

 

Share this post


Link to post
Share on other sites

1.  To renumber the Cabinets, just move them up or down in the Schedule.

2.  Partitions and Fillers would only be included in the Schedule if you use an actual Cabinet.  Once you customize a Cabinet to the configuration you want then add it to the Library and you can use it in the future.

Share this post


Link to post
Share on other sites

2.  Manually placed fillers will show up in the cabinet schedule.  Automatic ones won't.

Share this post


Link to post
Share on other sites
1 hour ago, Dermot said:

2.  Manually placed fillers will show up in the cabinet schedule.  Automatic ones won't.

Thanks for the clarification. 

  • It's an important distinction - most cabinet manufacturers simply add a 3" extension where a filler might be needed.  They then get trimmed in the field as needed.
  • It would be rare (IMO) for a manual filler to be specified or ordered - except for frameless cabinets..
  • It would be nice if there was a way to have the "extension(s) - right/left" to be automatically included in the schedule.  OTOH, using the OIP in X9 allows such things to be added as notes.

Share this post


Link to post
Share on other sites

For a Partition, start with a Cabinet.

  • Edit the width, height & depth
  • Edit the face elements.
  • Save to Library

Whenever you use that in a Plan it will be included in the Schedule.

Note that you can modify the CODE, DESCRIPTION, COMMENTS & MANUFACTURER in the OIP to provide more information in the Schedule.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
Sign in to follow this  

  • Member Statistics

    27461
    Total Members
    6254
    Most Online
    WaunakeeDesigner
    Newest Member
    WaunakeeDesigner
    Joined
  • Similar Content

    • By BuildingVision
      I'm sure this is simple, but I can't figure it out.  I'm new to Chief Architect...
       
      How do I get the callout labels to be smaller, like 1/2 the size they are showing on the image I have attached?  I am referring to the appliance and cabinet callouts.  I can't figure out where those text sizes are controlled. 
       
      I appreciate all the help!

    • By dskogg
      I want to show a window schedule for each elevation only showing the windows on that elevation, what is the best way to do this?
      This way i can show the sq footage of windows on that wall exposure and have it totaled in the schedule for just that wall.
    • By robdyck
      There must be a way to alter or control the vertical spacing of schedules. I've included the exterior elevation view of windows in my schedule, and there's a lot of wasted space between each row.
      Does anyone know if that can be adjusted?

    • By cjanderson66
      I seem to be having a problem that I am at my wits end with.  It appears that my plan is showing double callouts for all my windows and I can't seem to figure out how to get rid of them.  I have tried deleting my window schedule and then inserting it again but nothing.  Has anyone else had this issue before?
      Sosine NFP.pdf
    • By Sweeney
      Hey All, 
       
      Is there any way to include the jamb width in a door schedule? For example...
       
      Door Unit is a Marvin Clad Ultimate CUFD 3070 S LHIS
      Door Frame Size: 37 7/16" x 86"
      Door Jamb Size: 1 3/16"
       
      Door schedule shows the width as 35-1/16...**37-7/16" - (1-3/16 x 2)** and I want it to show 37-7/16
       
      Is there a macro I can edit to act more like the widow schedule preforms?
       
      Thanks is advance,