Member Statistics
-
Similar Content
-
By ChiefuserMathews
I was wondering is there a way to rename a symbol so that the name appears in the schedule will be as required rather than the CA symbol name. eg. 2 way ceiling register, I want to rename it as supply air to reflect in my schedule. Is it possible? Any suggestions how i can achieve that?
-
By wazzubrad
I am looking for a solution on how to insert schedules into Layout. I have tried converting the schedule while in a Plan to a Cad block and then inserting into layout by Copy/Paste, but this deleted the Note # specific to each line item and I would then have to manually add them for each line item on the layout page.
Here is a picture from a Chief layout where I have blue circled the schedule showing that Chief has inserted it into layout. Any ideas?
-
By ChiefuserMathews
Hello, Is it possible to create a ceiling assembly schedule in CA? I could not find one, nor an option to assign to a custom schedule. Any tips?
-
By verticalworks
We have limited space on our layout page and more pages than can fit. I cannot seem to find a way to do columns. The only option is to shrink the font but that will not be an option as the city requires a minimum font size. All I can come up with is to do a manual text box. This seems like there should be an easy solution to this as I know plan sets that are 60-80 pages and you would need multiple columns to show all the pages. Thought?
-
By ChiefuserMathews
Hello,
In one of my basement floor plan, for some reason the door number is displaying 2 numbers. I don't where is this coming from. Just to clarify there is only 1 door in that location. In the door schedule there is only one number for that door. I try to delete that door and inserted it again. I try to insert a new door at a different location, that new door also is displaying 2 numbers. Kind of crazy. Any help?? see attached image
-