4hotshoez

Window Schedule

Recommended Posts

There is a Comments column available, but how do I assign a comment to a window? Or would that just create another unique window type? Do I manually add comments to the schedule on the screen?

 

 

Share this post


Link to post
Share on other sites

Select window, open its Components, enter comment.

Share this post


Link to post
Share on other sites

You can also add any comment to the window label.

Share this post


Link to post
Share on other sites

Oo. Components are new to me. Never saw this before. Or maybe I did when I did not need it. So right-click on a window of a label gives me a menu with several options, including Components. Is this what your comment was referring to Perry? 

Share this post


Link to post
Share on other sites

Click on label enter info it will show in schedule

I must be missing something. The only label I know is the auto generated one that shows on the plan or elevations. I click on that and it highlights the label and the window, but there is no place to enter info when it is clicked. Either your instruction are vague, or I am getting the wrong idea.

Share this post


Link to post
Share on other sites

Specify Label in the window dbx changes the label. I have done that before, But I intend to rely on the Window Schedule for this project.

Share this post


Link to post
Share on other sites

anything you put in the label, will show only if you have included "label" in the window schedule items.

Share this post


Link to post
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now

  • Member Statistics

    27499
    Total Members
    6254
    Most Online
    Bren0625
    Newest Member
    Bren0625
    Joined