-
Posts
236 -
Joined
-
Last visited
Reputation
21 ExcellentProfile Information
-
Location
Lakefield, ON
Recent Profile Visitors
4639 profile views
-
I also realized I was playing around with the settings earlier with boxed / flush eave and it wasn't changing; I think it'd due to the wall changes I am making there. The bandboard will run all the way to the fascia.
-
Hi there, Is there a way to have soffit under the eave "flat", and then the gable end continue the siding and have no "boxed eave" at the gable end gable?
-
how do I create a half-wall (ledge) in the corner of a room
Ange822 replied to megclay's topic in General Q & A
Maybe try keeping it 1/2" away? Or used polyline solids instead of an actual wall. -
Thank you everyone for your help with this topic!! Would anyone know how to do the subscript numbers for the size of the windows / doors? Not sure if there is a way to have the window number / callout and label both shown in a bubble?
-
Oh wow that is great!! Thank you so much!! How did you change the size of the window to have the subscript number as the inches? Is there also a way to have the basement as 001, 002, 003... and then the Main Floor as 101, 102, 103.. and then I can just re-order them?
-
Hi there, I am new to the window schedule / labels and needing some help. Is it possible to number the windows clockwise around the house rather than just randomly allocating numbers? Is there also a way to label them starting with 0 for the basement, and 1 for main floor, 2 for 2nd floor etc. I was hoping there would be a way to have the window number above the window size. I tried playing around with "both callout and label" but I'm struggling to make it work. thanks in advanced!
-
Okay sorry I thought it was concrete. So yes you should do the 2x8 construction / decking.
-
Sorry I didn't realize it was X12. First thing I did was make sure the heights are matching for the Porch / Open to Below, as well as the floor finish / structure. Uncheck Sil Plate in the railing specifications. Continue the railing across the stairway, but "break" into a separate section. Then the separate section over the stairway would just be the Beam. No Railing. I drew foundation walls below. As mentioned made the stair tread # reduced, and changed it to concrete. I could be wrong but I don't think there is a cost to upgrade to the new Chief? I think the monthly / yearly subscription covers all of them? Could be wrong.
-
Hi Bob, I tried to fix it as best as I could. Only the front beam won't connect there is a small space you may need a polyline solid to fill it in. It seemed like you had too many steps so I made it the minimum number just over 7" riser height. New file attached, hope it helps! NEW FRONT PORCH ADDITION 1256 BLOOMERY ROAD - New.zip
-
Thank you @DBCooper That worked! Thanks for your help too @tundra_dweller!
- 7 replies
-
- 1
-
-
- door
- overhead door
-
(and 2 more)
Tagged with:
-
I wondered if it was a layer, I tried that and it didn't do anything
- 7 replies
-
- door
- overhead door
-
(and 2 more)
Tagged with:
-
Hi there, I would like to show a dashed line where the man door / overhead door openings are in the foundation plan. It used to default when I used X15 but since using X16 I can't seem to figure out how to show it. Thanks in advanced! Ange
- 7 replies
-
- door
- overhead door
-
(and 2 more)
Tagged with:
-
Amazing thank you!!
