Placing manual slabs X8


tommy1
 Share

Recommended Posts

I just started using X8 today and was having a hard time getting a manual slab to place at the right top height. I discovered that if I set the top height using the absolute value, it did fine. It was not set at that by default. You didn't have to do this in previous versions.

Link to comment
Share on other sites

Those options have been changed Tommy and they are much more flexible now but do require some fiddling. It solves a major problem with older versions where you had to calculate the heights for any second floor slabs using an absolute value. Now you can choose 'from floor' 'from finished floor' etc. to place second floor items accurately.

Link to comment
Share on other sites

I just started using X8 today and was having a hard time getting a manual slab to place at the right top height. I discovered that if I set the top height using the absolute value, it did fine. It was not set at that by default. You didn't have to do this in previous versions.

 

Yep.  That's because we did not have those options at all in previous versions. 