Cadwork22 Posted October 31 Share Posted October 31 If anyone has time, could you help with what I think is simple question and a huge time savior. There is a space between the loft floor and the and the ceiling beneath. I tried the structure options...see attached, thanks in advance. Summit.zip Summit.zip Link to comment Share on other sites More sharing options...
Solution mtldesigns Posted November 1 Solution Share Posted November 1 2 hours ago, Cadwork22 said: There is a space between the loft floor and the and the ceiling beneath Did you build your flooring? Link to comment Share on other sites More sharing options...
Cadwork22 Posted November 1 Author Share Posted November 1 Appreciate it I hadn’t considered framing thanks! Link to comment Share on other sites More sharing options...
mtldesigns Posted November 1 Share Posted November 1 1 hour ago, Cadwork22 said: thanks! YOUR WELCOME! Link to comment Share on other sites More sharing options...
ValleyGuy Posted November 3 Share Posted November 3 I ran into this problem before, same result of not filling in between the floor and the ceiling, but because of a different issue. You must use a wall that has layers, it is the wall's layers that becomes the fill-in material. I used a wall divider, that had no material layers, to define the loft with a separate rail (no room, no locate) inboard a little. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now