cbucks Posted March 4 Share Posted March 4 Sorry new b Is there a way to call out a clean out location for a sewer line in Chief? Link to comment Share on other sites More sharing options...
javatom Posted March 5 Share Posted March 5 How about a note with an arrow pointing to where it should go. Link to comment Share on other sites More sharing options...
tinadelllic Posted March 5 Share Posted March 5 Hi there, Here's what I use for my plans as the 2-Way Clean Outs typically need to be 24" apart. I've seen different surveyors and architects use different symbols and labeling for clean outs, the main objective here is to make sure that whatever symbol you use is in a drawing legend and/or clearly labeled directly on the plan. Hope this helps. CAD W LABEL - NEW 2-WAY CLEAN OUTS.calibz PS - I guess I should be clear that this is what I use for exterior clean outs (outside in yard). There are also interior clean outs for which I use an access panel with label, depending on the project scope. 1 Link to comment Share on other sites More sharing options...
joey_martin Posted March 7 Share Posted March 7 Zoom in to the top of this plan pic... Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now