Gawdzira Posted January 25 Share Posted January 25 Is there a way to make this suck less? This is a condition where the baseline lives at the wall line that is beyond this wall. Where we have a wall stagger but the roof plane goes over both, Is there a way to get the plate to automatically build correctly? Ignore the red dashed lines, they are for some measurement references. Help me Mr. Wizard... Link to comment Share on other sites More sharing options...
robdyck Posted January 25 Share Posted January 25 I get the same thing: Because this is controlled by the roof plane, a suggestion is to draw the higher roof plane separately to have 2 separate planes for each wall. Lock the framing for the taller wall, then re-join those 2 roof planes: Then: 1 Link to comment Share on other sites More sharing options...
Gawdzira Posted January 25 Author Share Posted January 25 Thanks. I guess I need to add the suggestions for being able to break the baseline and extend it for these conditions. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now